Excavation

Ground that carried a refinery from 1895 until the last barrel in 1991 does not dig like a clean field. The Platte River Commons site is still recovering from contamination, and the Superfund area in Evansville involves groundwater affected by former industrial operations. Excavation in this metro starts with a question the drawings rarely answer: what is in the soil we are about to move?

We dig foundations, footings, utility pits, equipment pads and basement levels for commercial and industrial owners. The work is simple to describe and unforgiving to do. The hole has to be the right size, the bottom has to be the right material, the sides have to stand, and the spoil has to go somewhere that is allowed.

Most of our excavation sits ahead of concrete or pipe. That makes the quality of the dig a direct cost to the trades behind us: a bottom that is overcut or disturbed turns into extra concrete or extra fill, and a wall that sloughs becomes a delay.

Keeping people out of the hole until it is safe

Excavation is the work that kills crews when it goes wrong, and the cause is almost always a wall that was not supported. Any trench or pit deeper than five feet needs a protective system unless the ground is stable rock, and many shallower digs need one as well. We slope the sides, bench them, or use trench boxes and shoring, depending on the soil classification a competent person assigns at the start of every shift.

Spoil goes at least two feet back from the edge, ladders or ramps are within reach of anyone in the excavation, and water is controlled so a wet wall does not turn into a slump. We call for utility locates before digging, hand-dig or pothole near marked lines, and keep equipment off the soft shoulder of an open cut. If a hole is left overnight, it is fenced and lit.

Permits, reports and the engineer of record

Casper requires engineered site drawings and plan review with engineering reports for commercial permits, and an issued permit runs for 180 days. Excavation that sits inside a permit window has to be scheduled with the inspection hold points, so footing inspections are not missed and a re-dig is not needed. We keep the permit set on site and walk the inspector through each hold point.

Where a site has environmental history, the plan usually calls for screening during the dig and a separate path for any soil that fails. We follow that plan to the letter and keep records of volumes, destinations and haul tickets. If the rules for a site are not clear, we stop and ask the owner and engineer before spoil leaves the property.

What an excavation package includes

A normal package covers clearing the dig area, staking from the survey, stripping topsoil, excavating to the design elevation, and trimming the bottom to a clean, firm surface. For trenching and backfill, we add the pipe bed, the backfill and the compaction testing. For footings, we leave a few inches for hand trim so the concrete sits on undisturbed ground.

The package also covers dewatering by ditch and pump where the groundwater is shallow, as well as stockpiling or hauling spoil. If the dig reaches a hard layer, the sequence changes into rock and hard ground excavation, and we will price that as a separate item before we start the breaker. Unmarked utilities are a risk in older industrial yards, so we confirm them with potholing and locating first.

Digging in the order the building needs

We dig toward the haul route. That keeps trucks from crossing the finished bottom and keeps the exit ramp for the last part of the work. The deepest portions go first so the pumps are placed early, and shallow portions follow once the access is set.

The bottom of every footing or pad excavation is checked against the drawings with a laser, and a soil tech or the engineer looks at it before concrete is scheduled. If the bearing material is not what the report described, we stop and document it with photos and elevations. A change order for over-excavation is easier to approve when the owner has seen the soil in the hole.

What drives excavation cost on this ground

Depth, soil type and groundwater are the headline factors. A dry, cohesive soil stands steep and digs fast. A wet, sandy soil needs flatter slopes, pumps and possibly a wider footprint, which multiplies the yardage. After that, the cost is spoil: how far it travels, what it costs to dispose of, and whether it can be reused on site.

On ground with industrial history, testing and special handling can matter more than the digging itself. We ask owners early whether Phase I or Phase II reports exist, because a clean report speeds the dig and a flagged one changes the plan. We also price standby time for inspections and weather days, so the number reflects real conditions.

Who calls us for digging

The calls come from oil, gas and midstream operators with yard expansions, from industrial and manufacturing owners adding process buildings, and from contractors who need the earthwork done before their own crews arrive. We also dig for manufacturing plant additions, where deep footings and pits are the norm.

The refinery area east of town, East Casper, shows what an operating facility asks of a dig crew. Lines run everywhere, access is controlled, and every opening has to be coordinated with the people who run the plant. We submit a dig plan with the equipment, the route and the shutdown windows, wait for approval, and then stay inside the boundaries it sets. Hot-work and confined-space rules apply to anything that is not a simple open cut, and we do not start until those permits are in hand.

Tell us what is in the ground

Send the site plan, any environmental reports and the foundation or utility drawings. We will return a dig plan, a spoil plan and the unknowns we would want resolved before a bucket goes in.

Questions Owners Ask

Can you dig on a site with a known contamination history?

Yes, with a plan. The owner or consultant defines screening, sampling and disposal, and we follow it. We keep work areas separated, document every load and stop when something unexpected appears. We do not guess about a smell or a stain.

How deep can you excavate without shoring?

The rule starts at five feet in many soils, but the real answer depends on the soil class and the surrounding loads. A competent person on site makes the call each day. We slope, bench or shore whatever the conditions require, and we do not enter a cut that does not pass.

What happens if we hit groundwater?

We pump from a sump or ditch to keep the bottom workable. If the volume is large, dewatering becomes a separate scope with permits for discharge. We tell you early so the schedule and budget include it.

Who decides whether the bottom is good enough?

The engineer of record or the geotechnical tech decides, not the equipment operator. We prepare the bottom, they inspect it, and we proceed once they approve. That is the sequence that keeps the foundation inspector satisfied.

Do you haul the spoil?

We can, and we do it on a planned route with tickets for every load. Reusable material is stockpiled on site if there is room. Anything that must leave goes to an approved place, and we give the owner the paperwork.

Related

Ready to talk about your project?

Request a Project Review

Ready to talk about your project?

Send the plans to Concrete Contractors of Casper info@concretecontractorscasper.com

Back to Concrete Services

Call307-344-4067