Ground that carried a refinery from 1895 until the last barrel in 1991 does not dig like a clean field. The Platte River Commons site is still recovering from contamination, and the Superfund area in Evansville involves groundwater affected by former industrial operations. Excavation in this metro starts with a question the drawings rarely answer: what is in the soil we are about to move?
We dig foundations, footings, utility pits, equipment pads and basement levels for commercial and industrial owners. The work is simple to describe and unforgiving to do. The hole has to be the right size, the bottom has to be the right material, the sides have to stand, and the spoil has to go somewhere that is allowed.
Most of our excavation sits ahead of concrete or pipe. That makes the quality of the dig a direct cost to the trades behind us: a bottom that is overcut or disturbed turns into extra concrete or extra fill, and a wall that sloughs becomes a delay.