The paint on the pavement says where a line is supposed to be. A pothole says where it is. Those two things are often a few feet apart, and sometimes much farther. A locate mark is a good starting point, but it is only a mark. Before a crew cuts a trench across it or a drill rig passes under it, someone should look at the pipe with their own eyes.
Potholing is the small hole that gets that look. A vacuum truck, with water or air, loosens the soil and sucks it into a tank, exposing the utility without scraping or striking it. The crew measures the depth, the size, the material and the direction, records the position with survey coordinates and backfills the hole. The cost of a pothole is a small fraction of the cost of a struck gas line, a cut fiber bundle or a broken water main.
We pothole as the first step of any underground job, and we also take on locating and potholing as a standalone service for engineers and owners who need a firm picture of what is in the ground.
