Curb, gutter and sidewalk follow rooftops in Mills, and the rooftops have been arriving. The town went from 3,461 residents in 2010 to 4,034 in the 2020 census, which is a lot of new street frontage, service lines and drainage to build on ground at 5,125 feet in the Casper area. We pour the flatwork, set the water and sewer services, and grade the lots and rights-of-way that this kind of growth demands.

Developers and builders in Mills usually need the same sequence done in the same order: rough grade, utilities in, subgrade proof-rolled, curb and gutter formed, walks and ramps poured, base prepared for paving. Done in order, it moves quickly. Done out of order, it means cutting fresh concrete to repair a sewer service. We lay out the sequence in writing and walk it with the owner's engineer before the first stake is pulled, then keep the utility conflict list current as the work moves down the street.

Streets, sidewalks and service lines

The core of our Mills work is street-side concrete. We form and pour curb and gutter to the grades on the plans, then check flow lines with water before the crew leaves. Sidewalks, driveway approaches and accessible ramps follow, with slopes and landings measured as we finish them, not after the inspector arrives. A ramp that misses its slope has to be broken out, and that is the most avoidable rework on any street job.

Underneath, we install water and sanitary sewer services, set manholes and storm structures, and backfill in lifts with compaction tests recorded for the town. Trenches stay shored or sloped, with spoil set back from the edge and a ladder within reach of anyone in them. We pothole known utilities before cutting, because gas and communication lines do not always sit where the as-builts say.

Working with the town's departments

The Town of Mills runs Building and Inspections, Planning and Zoning and Public Works, and Public Works includes a water treatment facility. In practice that means a project can touch three offices before the first cut. Planning and Zoning decides what is allowed on a lot, Building and Inspections reviews and inspects the structure, and Public Works controls the water and sewer connections and the street cuts. We keep a submittal list by office so nothing is missed.

Wyoming leaves building codes to local adoption, so the edition and amendments that apply to a Mills project come from the town or the county, depending on the site. We confirm that before design is locked. Water connections get special attention, since a tap into a public main needs coordination with Public Works about timing, shutdowns and testing, and a shutdown is never scheduled for a Friday afternoon.

Joint trenches and fiber

Mills has entered into franchise agreements with several telecom providers to build and operate fiber optic networks, and that means more trenches in rights-of-way where water, sewer and power already run. We cut conduit and fiber trenches, hold the clearances to existing lines, mark them, and restore pavement and landscaping afterward. Joint trenches save money when the owners agree on a layout before digging.

The region is putting money into fiber elsewhere too. A Wyoming Business Council grant of $617,483 covers about 30,000 linear feet of cable in and around the airport business park, which gives an idea of the footage and cost involved. We handle that kind of work on both sides of the metro, and our notes for the airport business park explain how conduit runs interact with paved surfaces.

Developers, builders and commercial owners

Subdivision work comes mostly from homebuilders and multifamily developers, who care about lot count, closing dates and curb that drains. They need a crew that can finish a block of flatwork in a week and still hold density and thickness. Commercial lots are different: commercial developers ask for aprons, parking and pads sized for truck traffic and snow storage.

In both cases, we price from quantities, not from guesses. Linear feet of curb, square feet of sidewalk, cubic yards of excavation and tons of base are written out, so changes on site can be priced the same way. If quantities shift because the plans are revised, the unit prices stay in place.

Finishing before the ground freezes

Concrete in a subdivision has an enemy: the date of the first hard freeze. We plan to have curb and walks poured and cured before it arrives, and we leave open trenches for late fall only when the owner understands the cost of heating and blanketing. The paving base is prepared and proof-rolled ahead of the paver. Work in neighboring Bar Nunn and other towns is sequenced so the construction trade partners and testing agency move efficiently between them.

Spring is the other pinch. Frost leaves the ground unevenly, and a base that tested well in October can pump under a loaded truck in April. We re-check subgrade before paving and recompact where needed. Tell us when you must open the street or hand lots to builders, and we will work back from that date.

What moves a street and lot budget

Three things move the number more than anything else. The first is subgrade: soft spots, buried debris and wet clay turn a clean cut-and-fill into over-excavation and recompaction, and the only way to price that honestly is to ask for the geotechnical report and probe the site. The second is the haul. Spoil that cannot be balanced on site has to leave, and clean fill has to arrive, so we calculate the import and export yardage and the distance before we quote.

The third is the thickness and strength of the concrete itself. Sidewalks, ramps and driveway aprons carry different loads, and a driveway across a walk that sees delivery trucks needs a thicker section than a walk alone. We price each item at its own thickness, tell you what the plans call for, and flag any detail that looks light for the traffic it will see.

Price your Mills street and lot work

Send the plan set, the lot count and the dates you need the street open. We will return quantities, a sequence and a price that follow the town's approvals. Contact us about your Mills project.

Questions Owners Ask

What does a typical subdivision street package include?

Rough grading, water and sewer mains and services, storm drainage, curb and gutter, sidewalks, ramps and the prepared base for paving. We sequence it so underground work is complete and tested before concrete goes in, and we keep a running conflict list with the engineer.

Who approves water and sewer connections in Mills?

Public Works controls connections and street cuts, so coordination starts with that office. Building and Inspections and Planning and Zoning handle other parts of the approval, and we track each submittal separately.

Can fiber and utility trenches share a path?

Often they can, if the owners agree on layout and clearances beforehand. A joint trench saves excavation and restoration but needs clear separation from water and sewer. We pothole existing lines first and confirm the arrangement in writing.

How do you prevent ramp and sidewalk rework?

We check slopes and landings with a level while the concrete is still workable, before final finishing. Forms are checked against the plan grades before the truck arrives. Rework on ramps is costly, so the checks happen before the pour.

Ready to talk about your project?

Request a Project Review

Ready to talk about your project?

Send the plans to Concrete Contractors of Casper info@concretecontractorscasper.com

Back to Service Areas

Call307-344-4067