Water flows uphill under pressure. Sewage does not. A sanitary sewer has to fall, every foot of its length, at a grade the engineer chose and the inspector will check. A line that is a quarter inch off at one joint can pond and stain for the life of the building. We treat grade as the whole job, and everything else follows from it.
Sewer work in the Casper area is rarely open country. New service gets tied into lines that were laid in different decades, through ground that holds water and sometimes holds contamination. Existing manholes are shallower or deeper than the drawings say. Old clay pipe turns up where PVC was expected. A sewer crew that is surprised by these things loses days. A crew that expects them loses hours.
We lay the line from the downstream end, up the grade, with a laser and a level on every pipe. The crew keeps its trench short, its bedding clean and its records current, because a sewer is a buried system and nobody will ever see it again.