Three feet to the top of footing is the frost line the City of Casper publishes, and every footing we form starts from that number. Set a footing shallower and the ground lifts it each winter. Set it deeper than needed and the owner pays for excavation, forms and concrete that did the building no good. The right answer sits between those two failures.
Footings spread the load. Stem walls lift the building off the footing and carry it up to the slab or floor line. Together they are the first concrete on most commercial jobs, and they set the line for everything after. Out-of-plumb forms or a footing poured at the wrong elevation follow the building to the roof.
We form and pour footings and stem walls for steel buildings, tilt-wall shells, masonry and wood-frame commercial structures in the Casper area. The work is plain, and the margin for error is thin. Layout, depth, reinforcing and cover are the points that matter, and we check each one before a truck arrives.