Edgerton

A company town built for oilfield workers still behaves like one when a contractor shows up. Edgerton sits at the edge of the Salt Creek Oil Field and was created to serve the oil businesses and residents who supported it. The field's own rule was that only people who worked directly for an oil company could live on the field, so Edgerton took on the role of the support town at the field's edge. We build in that kind of place: shop slabs, yard paving, small buildings, utility services and the dirt work that sits between a lease and a town.

Edgerton is at 4,898 feet and had 153 residents in the 2020 census. A town that small has few contractors of its own, so work either gets done by whoever drives out from the city or does not get done. We drive out. We bring the forming package, rebar, a pump if the pour is large and the safety plan to go with it.

WYO 387 continues east through Edgerton after passing Midwest, so the road also provides the planned approach for construction deliveries on this stretch.

Working at the boundary between lease and town

The first question on an Edgerton job is who owns the ground and who sets the rules on it. A lot inside the town answers to the town and the county. A site on the field answers to its operator and carries its own safety program. We ask early, get the right approval in writing and brief the crew on the rules before we mobilize.

The second question is what is under the ground. Pipelines, old flowlines and buried cables are common in oil country. We locate, pothole and probe before every cut, and we keep a competent person on the excavation any time people are in it. Then we build in a simple order: clear, grade, compact, install utilities, form, pour and cure. We do not skip steps to save a day, because a rework trip out here costs more than the day.

Buyers who work out of Edgerton

The buyers are the same ones who keep the field running: operators, service companies, pipeline crews and the general contractors who build for them. A service company may want a paved yard and a shop floor. An operator may want a pad for a new vessel or a containment slab for a tank. A contractor may need a crew pad, a parking area or a storage building foundation.

We keep the paperwork light and the scope clear. For oil, gas and midstream customers, we provide a priced scope, a schedule and a safety plan, and we follow the owner's field rules. For industrial and manufacturing owners with shops nearby, we offer the same package scaled to the building.

Frost, wind and small-site logistics

Edgerton is high and exposed, and wind pulls moisture out of a fresh slab as fast as it pulls heat out of a crew. We plan the pour for the lee side of the building when we can, put up windbreaks and start curing at once. In winter we use blankets and heated enclosures and never place on frozen ground. Footings go below the frost line the local authority requires, and we confirm that depth with the engineer before we form.

Logistics are the other limit. Materials come from a distance, so a missing coupler or a short order of rebar becomes a lost day. We check the pour sheet the afternoon before, load the truck with spares and keep a second finishing crew on call. For a one-day pour, we also pre-set the pump, the washout and the curing compound so nothing slows the finish.

Slabs, services and yards

A typical Edgerton package includes a slab on grade for a shop or storage building, a paved or concrete yard, a driveway apron to the county or state road and a utility connection for water and sewer or a septic system. Sometimes it includes a duct bank or conduit for power and communication.

We handle the lot as a whole: rough grade, drainage, compaction, utilities, forms, steel and concrete. The construction trade partners also install site utilities and prepare the pad for a pre-engineered metal building, which is a common choice for shops out here. We set anchor bolts to the manufacturer's template, check them for elevation and plumb before the pour and protect the threads until the erector arrives.

The stretch we cover from here

From Edgerton we work back along WYO 387 to Midwest and out onto the Salt Creek Oil Field itself. We also serve the north side of Casper along the North Casper I-25 corridor, where many of the same companies keep their yards and offices.

That geography lets us offer a steady crew for a string of small jobs. A pad at the field, a driveway in town and a shop floor on the highway can fall in the same week, and we keep the equipment moving instead of loading and unloading for each. Fewer mobilizations means fewer empty miles on the highway, and it keeps the price of a small job closer to the price of the work itself.

Winter access can change the plan. If the road is drifted or icy, we hold the heavy trucks until it is safe, adjust the pour day and tell the owner the same morning. A late start is cheaper than a truck in the ditch.

Tell us where the line is

Send us the parcel, the owner and the scope. We will confirm whose rules apply, locate what is below and give you a plan and a price.

Questions Owners Ask

Do you work on both town lots and field leases?

Yes. We follow the town and county rules on town lots and the operator's safety and access rules on the field. We ask which applies at the start and confirm the approval in writing.

Is a metal building the right choice for a shop out here?

Often, yes. Metal buildings erect quickly and are economical for shops and storage. The foundation still has to be right, with footings below frost, a flat slab and anchor bolts placed to the manufacturer's template. We build that foundation to suit the building.

How do you handle pipelines and buried lines near a new pad?

We ask the owner and the one-call center for locates, then pothole to confirm depth and location. We keep a competent person present and stop if the cut shows something not on the drawings. Nothing near a live line is dug by machine.

What does wind do to a slab pour?

Wind dries the surface faster than the concrete can bleed, causing plastic shrinkage cracks. We use windbreaks, fog or evaporation retarder, finish quickly and apply curing compound right away.

Can you pour in winter at this elevation?

We can, with protection. We thaw or replace frozen subgrade, use blankets or enclosures and keep the slab warm until it reaches strength. Severe cold or high wind may still force a delay.

Ready to talk about your project?

Request a Project Review

Ready to talk about your project?

Send the plans to Concrete Contractors of Casper info@concretecontractorscasper.com

Back to Service Areas

Call307-344-4067