Industrial and Manufacturing Owners

Replacing a crude unit that dates to 1928 is a lesson in what industrial owners inherit under their feet. The Casper-area refinery completed a two-year, roughly $200 million modernization that retired units built in 1928, 1948 and 1955, and the work added new tanks and a gas-fired heating plant. Every one of those items stands on a pad, a pier or a containment slab that somebody had to excavate, compact, form and cure in a climate that freezes. That is the work we do for industrial and manufacturing owners.

Industrial buyers are not shopping for a low unit price on a sidewalk. They want a crew that understands an operating plant: permits to work, hot-work restrictions, tie-ins that need a shutdown, traffic on the access road and the fact that a slab poured today will carry equipment for a long time. We price that sort of work by quantity and by risk, and we are blunt about where the risk sits.

Industrial ground around Casper and Evansville

The refinery at 5700 East Highway 20-26 lists 30,000 barrels per day of capacity and runs primarily Wyoming and Rocky Mountain sweet crude. At the time of the modernization it employed 145 people plus contractors, which is a reminder that a plant's own workforce is small compared with the trades who show up for a turnaround. A turnaround year brings a wave of foundation, pad and containment work in a few months, and crews and concrete plants get tight.

The east side also carries history. The Mystery Bridge and U.S. Highway 20 Superfund site in Evansville involves groundwater contamination believed to come from former industrial operations, which affects how we plan dewatering, spoil handling and excavation depth near that corridor. We read the environmental record before we price, and we ask owners what is known about the ground in the area of their pad.

What goes wrong on plant concrete

Machine foundations fail quietly: a pad that is too thin, a grout bed with voids, anchor bolts out of position by a quarter inch. Containment slabs fail visibly, with cracked joints and leaking sealant. Wash-down floors fail because the slope was never right. We prevent those problems by checking the template against the equipment drawings, setting bolts to the manufacturer's tolerance, pouring in controlled lifts and sealing joints with the compound the process requires.

Mix design is part of the plan. Heavy foundations can generate heat and need a lower-heat mix or a pour in staged lifts. Hot-weather days in July are the opposite problem, with evaporation drying the surface before finishers reach it. See our approach to equipment pads and machine foundations and to containment pads and secondary containment for the details.

Dirt, pipe and concrete in one scope

A modern plant package mixes underground work with concrete work. Utility trenches, drain lines, duct banks and manholes go in before the pad above them, and they cross the same ground the foundation crew has to prepare. We schedule and inspect the excavation, backfill, compaction testing, forming and placement as one scope, so one foreman owns the grade from subgrade to top of slab.

That matters on a shutdown schedule. If a tie-in has to be live on a particular weekend, you do not want a pipe sub waiting on a concrete sub waiting on a testing lab. We stack the activities, pre-form what we can off-site and set a call-ahead with the lab, then work the weekend as one crew.

Permits to work and plant safety rules

We follow the owner's permit-to-work, lockout, confined space and hot-work procedures, and we bring our own orientation records to the gate. Mobile equipment is the real hazard inside a plant fence, so we plan haul routes with spotters, mark overhead pipe racks and keep backing movements to a minimum. Excavation near live process lines is done by potholing and hand digging until we have positively identified what is below.

We do not claim certifications we cannot show. What we can say is that we write a site safety plan for every industrial job, we tailgate it each morning, and we stop when the plan and the conditions disagree.

Where industrial concrete cost comes from

Rebar and formwork dominate heavy foundations, followed by the concrete itself and the testing program. Remote or restricted access adds labor: hand-carried materials, longer pump boom reach, escort time at the gate. Shutdown work costs more per hour because it runs in shifts. We show these costs as distinct lines, and tell you which can be traded and which cannot.

Existing conditions add risk. Old foundations in the way of a new pad, contaminated soil and unmarked lines are routine on a plant that has cycled through several rounds of equipment. We carry allowances for demolition and unforeseen obstructions as unit prices, so the cost of a surprise is already agreed.

The buildings and pads that go with the process

Process equipment needs buildings around it. A manufacturing plant wants heavy slabs with joint layout matched to forklift traffic. A flex light industrial building wants a lighter floor and more office. The NCIA Business Park next to the airport houses more than 35 businesses ranging from manufacturing to aviation, which is a good sample of the mix of small plants and shops we see around town. A vehicle plant is another version of the same pattern, and it has its own page under automotive and EV plant work.

If your project sits near the airport, the same owners are often thinking about logistics and warehouse expansion as well. And when the process in question is oil handling, the discussion moves to oil, gas and midstream practice, which has its own rules on secondary containment and access roads.

Walk the plant with us

Send the equipment list, the shutdown dates and any environmental records. We will tour the site, mark the unknowns and give you a priced sequence.

Questions Owners Ask

Can you work during a scheduled turnaround?

Yes, if we are on the bid list early. Turnaround work compresses a year of foundation and pad activity into weeks, so we reserve crews, pump time and concrete plant capacity before the shutdown starts. We ask for a pre-job walk, the permit-to-work rules and the shift pattern, and we plan every pour around them.

How do you handle old foundations and unknown ground?

We pothole and probe before we dig, review any environmental records the owner can share and price demolition of buried concrete as a unit rate. If we strike contamination, we stop, notify the owner and wait for direction. Nothing leaves the site until its destination is agreed in writing.

What slab thickness do heavy industrial floors need?

That is an engineering decision based on wheel loads, rack loads, subgrade strength and joint layout, and we build to the engineer's drawing. We help by reading the geotechnical report for subgrade modulus and by testing the compacted base. If the numbers do not match the assumptions, we raise it before the pour.

Do you handle hot weather as well as cold?

Both. Cold means blankets, enclosures and a warm mix. Hot, dry and windy days mean fogging, evaporation retarder, shaded mixing and earlier pours. Casper sits at 5,150 feet in a dry climate, so the wind can matter as much as the temperature.

Ready to talk about your project?

Request a Project Review

Ready to talk about your project?

Send the plans to Concrete Contractors of Casper info@concretecontractorscasper.com

Back to Industries We Serve

Call307-344-4067