General Contractors and CM Firms

Bid day for a concrete package tells a general contractor very little about whether the slab will be flat in February. What tells you is the sequence behind the number: who is stripping the pad, who is potholing the utilities, when the rebar arrives, which pours need blankets and who owns the cylinder breaks. We sell that sequence to general contractors and construction managers in the Casper area, as a subcontractor that manages the dirt, the utilities and the concrete as one scope so you hold one contract instead of three.

Most of the calls we take start with a drawing set and a hard date. The date is rarely the problem. The problem is that Casper's frost line, its freezing index and its permit review all sit between the date and the work. We read the set for those three things first, then price the quantities, then tell you where the schedule is soft.

One scope from subgrade to cured slab

We bid concrete work to include the ground it sits on. That means stripping, proof-rolling, correcting soft zones, placing and compacting the base, then forming, placing rebar, pouring, finishing and curing. When the same foreman owns the subgrade and the slab, a failed proof-roll becomes our problem to fix in the field the same day instead of a letter between trades.

For a construction manager, this shortens the critical path in a quiet way. Fewer handoffs means fewer inspections called twice and fewer mornings where one crew waits on another. It also means one superintendent to call when the weather turns and a pour has to move.

The packages we usually take

We take foundations, footings and stem walls, slabs on grade, flatwork, curb and gutter, paving and site utilities as separate bid items or as a single site-and-concrete subcontract. On vertical work we place the structural concrete and let the framer or steel erector own the rest. For a pre-engineered metal building, that usually means the pier or footing layout, anchor bolt templates held to the manufacturer's tolerance and a slab that waits for the roof to be on.

Hold the rebar conversation early. Placement, chairing and tie spacing are what keep steel at the right cover in a slab that will see trucks, and supply is a lead-time item. Our write-up of rebar placement covers how we handle it, and building pad preparation covers the ground work you will want finished before the first form goes in.

Permit review, local codes and who owns which inspection

Wyoming does not have a single statewide building code, according to the International Code Council; cities and counties adopt and enforce their own, and requirements vary by jurisdiction. In the City of Casper the 2024 International Codes are listed, with amendments in Title 15 of the municipal code. Commercial permits often ask for a life-safety plan, engineered building and site plan drawings and Planning/Zoning approval, and an issued permit is good for 180 days.

The practical advice for a general contractor is to check which office issues the permit before you assign inspections to subs. A job in Mills or Evansville is reviewed by that town, and the footing inspection, the compaction report and the special inspection of concrete may be arranged differently. We keep a log of every inspection on our scope and send it to your project engineer weekly, and our concrete testing and quality control page explains who orders cylinders, slump checks and field density tests.

Working next to your trades without stopping them

Concrete placement draws a crowd. Pumps and trucks need a route, finishers need a clear floor, and laborers need rebar caps and guarded openings. We lay out the haul route and pump position before the pour, mark overhead and underground utilities, and keep our trench work shored, sloped or boxed according to the competent person on the day. Trenches left open overnight get fenced and lit.

If your site has other trades working at the same time, we want a morning meeting. The construction trade partners do not like surprises with excavators and lifts, and your superintendent needs construction traffic to leave room for steel deliveries. Talking for ten minutes is cheaper than a stand-down.

Hospital steel and metal-building schedules as a benchmark

Large projects in Casper show the calendar problem plainly. The four story West Tower at Wyoming Medical Center topped out in June 2013 with about 750 tons of structural steel and a separate 5,000 square foot MRI building, joined to the occupied hospital by sky bridges. That kind of vertical schedule is driven by steel delivery and crane time, and the concrete under it has to be ready earlier than the paper suggests. Our page on the Wyoming Medical Center campus looks at that ground in more detail.

We give general contractors a pour calendar, not just a start date. It lists each footing, wall and slab pour by week, with the cold-weather method assigned to those that fall after mid-October, the testing agency's call-ahead time and the curing period before loading. You can drop it into your master schedule and hold us to it.

Neighbors in the owner chain

A general contractor often answers to the same few owner types, and each reads concrete differently. A commercial developer cares about the tenant date and the cost per square foot of pad, while a school or hospital owner cares about noise, vibration and infection control. We adjust the pour schedule, haul route and cleanup to what the owner will inspect.

On industrial work the owner brings process requirements to the table, and the slab conversation moves to joint layout, wheel loads and chemical resistance. If your pursuit list includes a refinery or plant, industrial and manufacturing owners is where we explain how that scope is different.

Send the bid set

Send the drawings, the specification sections and your target dates. We will return a priced scope and a pour calendar you can drop into your schedule.

Questions Owners Ask

Do you carry the whole site package or just flatwork?

We can do either. Many general contractors give us the stripping, utilities, base and concrete as one subcontract because it removes handoffs. Others want only flatwork and curb, with another sub on the dirt. Tell us the split and we will bid it as drawn, and we will point out where a gap between scopes tends to hide.

Who pays for special inspection and testing?

That is set by the contract documents, not by us. We cooperate with the testing agency on every pour, hold trucks for slump and air checks and leave cylinders where the lab can cure them under standard conditions. If the specification puts testing on the subcontractor, we carry it as a separate line so the number is visible.

How do you handle winter pours on a fixed completion date?

Casper's published criteria list a 3,000 air freezing index and a three foot frost line, so we plan winter concrete as a normal condition instead of an exception. Protection can mean heated enclosures, insulated blankets and an accelerated mix, and each has a price. We give the general contractor the cost of protection against the cost of waiting and let you pick.

Can you work around an occupied building?

Yes. We separate our haul route from the owner's circulation, schedule noisy cutting and compaction outside peak hours, and wash down trucks before they leave the site. Tell us the restrictions in the bid documents and we will price them.

What do you need to give a firm number?

A civil set with grading and utility sheets, the structural drawings, the geotechnical report and the specification for concrete and earthwork. A site visit helps when the ground is a former yard or a utility corridor. We will tell you what is missing and price the rest.

Related

Ready to talk about your project?

Request a Project Review

Ready to talk about your project?

Send the plans to Concrete Contractors of Casper info@concretecontractorscasper.com

Back to Industries We Serve

Call307-344-4067