Utilities and Energy Companies

Two turbines rated 18 MW each, 36 MW installed, turn water from the North Platte into about 92 million kilowatt hours a year at Alcova Dam. A coal-fired generating station sits near Glenrock, and a rail line terminates in Casper. Fiber is going into the ground around the airport. Power, water and communications owners in this metro all depend on trench, pad and vault work that has to be right the first time, because the cost of finding a mistake later includes an outage. That is where we come in.

We work for utilities and energy companies as a dirt, pipe and concrete subcontractor. We open ground, protect what is already in it, place conduit and duct banks, pour the pads and vaults that equipment sits on and put the ground back to a compaction spec the utility can sign. We are not an electrical or pipeline contractor, and we do not pretend to be; our job is the civil work that the licensed crew needs finished before they arrive.

Trench, duct bank, vault and pad work

The common scope for a utility owner is a trench and what goes in it. Electrical duct banks are formed or trenched, conduit is spaced and supported, and concrete encasement or flowable fill is placed to the engineer's detail. Telecom and fiber work often uses smaller trenches in long runs, with handholes and vaults at set intervals. Our pages on electrical duct banks and conduit and fiber trenching explain how we handle spacing, cover and backfill.

Equipment pads are the other half. Transformers, switchgear and cabinets need level, reinforced pads with conduit stub-ups cast in at the right place, and a base that will not settle. We form them from the manufacturer's drawing, set the conduit with templates and pour with a mix designed for freeze-thaw exposure.

Where utility money is moving locally

The Wyoming Business Council approved $617,483 in grant funding for Natrona County to install approximately 30,000 linear feet of fiber optic cable in and around the airport business park at 8500 Airport Parkway. Mills has entered into franchise agreements with several telecom providers to build and operate fiber networks. Fiber work is spread across the metro, in town streets as well as industrial parks.

Power and water generation are long-lived assets. Alcova Reservoir holds 184,405 acre-feet in total and 30,606 acre-feet usable for irrigation, and the dam was finished in May 1938. Work around structures like that is infrequent, specialized and conducted under agency rules. We will say so when a job is outside our experience, and we will bring in the right specialist to help you scope it.

Locates, clearances and live lines

Call before you dig is the starting point, not the finish. We request locates, then pothole to verify depth and location, then dig by hand near any marked line. Where a trench runs parallel to a live line, we hold a clearance set by the owner and monitor it as the excavation deepens. Cave-in protection is chosen for the soil: sloping, benching, a trench box or shoring, with a competent person on site.

Working near energized equipment is a utility owner's rule set, not ours, and we follow it. We attend the owner's safety orientation, observe minimum approach distances for equipment such as excavators and pump booms and keep a spotter on any move near overhead lines. For the dirt side of this work, see utility relocation, where the clearance question comes up most often.

What we coordinate on one schedule

We coordinate excavation, shoring, bedding, backfill, compaction, forming, rebar and concrete placement on one schedule. That means the team that schedules the trench also tracks the backfill tests, and the foreman who checks the conduit also oversees the encasement pour. For a utility owner, one team means one point of accountability and fewer visits from different subcontractors to your easement.

We do not list equipment counts or crew sizes, because the right size for a job depends on the job. What we can promise is that the plan names the machines and the people before the work starts, so that what you see in the field matches what we bid.

Easements, restoration and weather

Utility corridors cross private ground, and restoration is part of the work. Topsoil is stripped and stockpiled separately so it can go back on top, fences and driveways are repaired and seeding or erosion control is placed before we leave. Casper's climate criteria list a three foot frost line and severe weathering, so trench depth, cover and compaction need to account for freeze and thaw cycles that can lift or crack what is placed too shallow.

Seasons matter. Frozen ground slows trenching and makes backfill harder to compact, and spring thaw can turn a corridor into mud. We plan long linear projects in segments that can be closed and restored within a season, and we leave the surface in a state the landowner and the owner's inspector accept.

Where this connects to other owners

Utility work and oilfield work share trenches in much of the region, so the practices described for oil, gas and midstream owners overlap with what a power or communications owner needs. In town, utilities sit in the same streets as municipal and public works projects, and coordination between them decides how often a new street gets cut.

We also look at ground the utility already knows. The area near Glenrock, with its generating station and the interstate corridor, and the reservoir area at Alcova each have their own access and soil conditions, and we plan for them separately.

Send the route and the standards

Send the alignment, the owner's construction standards and your outage windows. We will return a segment plan, a bid and our clearance approach.

Questions Owners Ask

Do you install the conduit or only the trench?

Both, in most cases. Placing conduit, spacers and concrete encasement is civil work we do routinely. Pulling cable, terminations and energizing are the electrical contractor's work, and we coordinate with that firm on testing and mandrel runs before backfill.

How deep do you bury lines in Casper?

Depth comes from the owner's standard and the engineer's drawings. Casper lists a three foot frost line, and a water line needs cover below it. Electrical and communications depths depend on voltage and the utility's specification, and we build to the drawing.

What do you do when a trench hits groundwater?

We use sump pumping or a dewatering system sized for the inflow, discharge to an approved location and keep the trench stable. Bedding and backfill go in only once the water is controlled, and we log the depth and conditions for the owner.

Can you work on a utility easement across private land?

Yes. We walk the easement with the owner and landowner, mark the working limits, protect fences and crops where required and restore the surface to the agreed condition. A photo record before and after saves arguments later.

Ready to talk about your project?

Request a Project Review

Ready to talk about your project?

Send the plans to Concrete Contractors of Casper info@concretecontractorscasper.com

Back to Industries We Serve

Call307-344-4067