Midwest

A 148 degree spread separates Midwest's record low of minus 42 F from its record high of 106 F. A concrete crew working there deals with both ends of the thermometer inside the same year. We build slabs, flatwork, water and sewer lines and yard paving for the town and for the oilfield businesses around it, and we plan every pour for the temperature, not the calendar.

Midwest sits at 4,849 feet and had 285 residents in the 2020 census, down from 638 in 1980. A small and shrinking town does not need new subdivisions. It needs old pipe replaced, worn pavement rebuilt, small buildings kept up and service yards that work for the field. The Town of Midwest says its history has a taste of the oil field pioneers and that new oil field industries operate there too, which fits what we see: a mix of town infrastructure and industrial support work, sharing the same road.

That road is WYO 387, which begins at a diamond interchange with I-25 and US 87 at exit 227 and runs about 6 miles east to Midwest. Every load of concrete, fill and pipe arrives that way.

Pours that fit a 148 degree range

The spread between the record high and the record low is 148 degrees, and the concrete work follows it. In cold weather we protect fresh concrete with blankets, insulated forms or heated enclosures, never place on frozen subgrade and keep the surface from freezing until it reaches strength. In heat and wind we dampen subgrade, shade the placement, use set retarder if needed and cure the same hour we finish.

Most exterior flatwork here lands in the late spring to early fall window, with grading and utility work running longer when the ground allows. We book the ready-mix early and tell the supplier the plan. If the forecast moves, we move the pour. The protections are the ones we use for cold-weather concrete and hot and windy weather concrete everywhere else, applied with less margin for error.

Town works and field support

A town this size has a short list of public needs: water lines, sewer, streets, a few public buildings and the occasional park or event space. Salt Creek Days runs each second weekend of August, which draws visitors and puts demands on parking, walks and temporary access. We keep construction off the town's calendar for that weekend and finish exposed work before it begins.

Oilfield service work is the other half. Yards need paving that survives heavy equipment. Shops need floors with drains. Tank and compressor sites need pads. Companies in utilities and energy companies often handle several small sites at once, and they want a contractor who can move a crew between them without losing a week. We keep a small, mobile package of forming, steel and finishing tools ready.

Permits, frost and public work rules

Wyoming leaves building code enforcement to cities and counties, and the state does not mandate local adoption, so the first step on any job here is to ask the local authority what applies. The International Code Council notes that requirements vary by jurisdiction, and builders should check with the local building department before starting. We follow that advice on every site, and we write the answer into the scope.

Design values such as frost depth, snow load and wind speed are set locally. For a project in this part of the county, we ask the engineer of record which criteria govern, since published figures from Casper may not match what the county applies at Midwest. Frost-protected footings, air-entrained mix and proper drainage are standard in this climate whatever the number. For municipal water or sewer work, the town engineer also reviews trench, bedding and testing details.

What we coordinate in a small town

We coordinate excavation, pipe, forming, rebar, concrete placement and finishing as one scope. In a town of a few hundred, that matters because a prime does not want to coordinate five subs for a single block of water main. We open the trench, bed and lay pipe, test, backfill and pour the patch or the apron. One team, one schedule, one set of tickets.

That approach carries to the buildings too. A town shop, a fire station or a community room usually needs a footing, a slab, a few ramps and a driveway apron. We pour them in a few days, cure them properly and leave the site tidy. On pipe jobs, the trade team for water main installation handles bedding, thrust restraint and pressure testing before the street is patched.

Neighbors along the highway

The nearest settlement down WYO 387 is Edgerton, which sits at the edge of the field, and the Salt Creek Oil Field itself lies just beyond. We often run both under one mobilization, because the crew, the water truck and the pump are already on the road.

Town and county owners also come to us through municipal and public works procurement, which has its own bid rules, bonding and prevailing wage questions. We help the owner scope the work in a way that matches the budget, and we price it in lump-sum or unit prices as the bid asks.

Plan a pour for the weather you actually get

Send us the scope and the dates you need. We will show you the weather risk, the haul plan and the price, and we will tell you when the work should wait.

Questions Owners Ask

How do you handle concrete in a place that gets this cold?

We keep the ground from freezing under the pour, protect the concrete with blankets or enclosures and use a mix designed for freeze and thaw. Forms stay on longer in cold weather and the surface is kept above freezing until it gains strength. If the ground is frozen and cannot be thawed, we wait.

What does summer heat do to a pour?

Heat and wind pull water out of the surface, which causes cracking and weak finish. We wet the subgrade, use set retarder where needed, shade or fog the surface and start curing right after finishing. We also pour early in the day.

Can you work on town water and sewer lines?

Yes. We install water and sewer pipe to the town's standard, with bedding, compaction and testing, and we restore the surface. The town engineer or inspector reviews the work, and we keep records of pressure tests and compaction results.

How far is the concrete haul?

The last 6 miles run on WYO 387 from the interstate, and the batch plant is not in town. We confirm travel time with the supplier before we pour and adjust the mix to match.

Will construction conflict with local events?

We avoid heavy work on the second weekend of August, when Salt Creek Days is held. We also coordinate with the town on parking, closures and delivery times for any other event.

Ready to talk about your project?

Request a Project Review

Ready to talk about your project?

Send the plans to Concrete Contractors of Casper info@concretecontractorscasper.com

Back to Service Areas

Call307-344-4067