Concrete work in Casper is planned around weather before it is planned around drawings. The city's own engineering criteria put the town in climate zone 6B with severe weathering, and that decides how we build here. We pour footings, slabs, aprons, paving and flatwork, and we run the water, sewer, storm and fire lines and the grading that sit under them. Footings go three feet down to clear frost. The pour window closes early in the fall. The ground under one lot can behave very differently from the lot across the street.
Most of our buyers here are general contractors, developers, oilfield and refinery owners and public works departments. They want a crew that names the yardage, the sequence and the weather window before the job starts, and then holds to it. Casper sits on the North Platte at 5,150 feet and is served by Interstate 25, US 20, 26 and 87 and a handful of state highways, so getting trucks and iron to a site is rarely the hard part. The calendar is the hard part.