Concrete pavement is a bet on the next thirty winters. It costs more up front than asphalt, and in return it carries wheel loads without rutting, resists oil and fuel, and needs far less maintenance. Whether that bet pays depends on the subgrade, the thickness, the joint layout and how well the slab is cured, in that order.
We place concrete paving for truck yards, equipment lots, access roads, intersections, fueling areas and heavy parking in the Casper area. Oilfield service yards, regional freight and the industrial parks around the airport all put demanding wheel loads on pavement, and concrete handles them where a flexible surface would deform.
A paving job is mostly about base and layout. The drawing shows a thickness and a joint pattern, but the real work is in getting a uniform, well-compacted foundation under every square yard, and in cutting the joints at the right time. We plan the pour around those two things.
