Concrete Paving

Concrete pavement is a bet on the next thirty winters. It costs more up front than asphalt, and in return it carries wheel loads without rutting, resists oil and fuel, and needs far less maintenance. Whether that bet pays depends on the subgrade, the thickness, the joint layout and how well the slab is cured, in that order.

We place concrete paving for truck yards, equipment lots, access roads, intersections, fueling areas and heavy parking in the Casper area. Oilfield service yards, regional freight and the industrial parks around the airport all put demanding wheel loads on pavement, and concrete handles them where a flexible surface would deform.

A paving job is mostly about base and layout. The drawing shows a thickness and a joint pattern, but the real work is in getting a uniform, well-compacted foundation under every square yard, and in cutting the joints at the right time. We plan the pour around those two things.

Subgrade, thickness and joints

We start by proof-rolling the subgrade with a loaded truck and watching for pumping or rutting. Soft areas are removed and replaced, and base material is placed in lifts, compacted and tested. A pavement slab sitting on a base that varies in stiffness will crack at the transition.

Next come the forms or the slipform paver, the dowels at transverse joints and the tie bars at longitudinal joints. Dowel baskets are staked and checked for alignment, since a skewed dowel locks a joint and causes cracks. The concrete is placed, consolidated, struck off and textured with a broom or tine finish. Curing compound goes on promptly, and joints are sawn as soon as the slab can take it without raveling. Related work in parking lot concrete follows the same sequence at a lighter loading.

Why the north corridor matters for paving

The Interstate is the spine of this market. North of Casper, I-25 has exits at WYO 254 Wardwell Road (191), Westwinds Road, which opened in October 2018, and Ormsby Road in the Homa Hills area (197). Each interchange gives land direct highway access, and any commercial or industrial lot that develops near one needs entrance aprons, truck circulation and parking.

WYO 254, the Salt Creek Highway, runs from Mills through Bar Nunn to exit 191 and follows the old alignment of US 87. The north Casper I-25 corridor is where we look first when an owner asks about new yard and access paving, because the highway access is already there.

Loads, fluids and the design thickness

Pavement design starts with the vehicles. A lot with delivery vans needs less thickness than one with loaded tractor trailers or heavy oilfield equipment. The design engineer sets thickness based on traffic count, axle loads and subgrade strength. We review that design against what the owner says will actually use the site, because mismatches are common and expensive.

Fluids matter. Fuel, hydraulic oil and drilling fluids soften asphalt and leave concrete largely unaffected, which is one reason concrete is favored in truck wash areas, fueling pads and equipment staging. Where containment is required, we form curbs, sumps and slopes into the pavement itself. At the rail yard northeast of the airport, which handles construction materials, refining products and bentonite, owners know how heavy loads and spills test a surface.

Specifications, testing and permits

Paving specifications usually call for a minimum compressive or flexural strength, air content, slump limits and joint details. Testing agencies sample the mix, cast cylinders or beams and test density of the base. We assemble the paper trail so the owner has a record of each pour.

City of Casper commercial permits often require engineered building and site plan drawings, and plan review covers specifications. A paving plan that disagrees with the grading plan will be flagged, so we compare them before the permit is submitted. Outside city limits, the county or town rules apply, and Wyoming has no single statewide building code. We find out who inspects the paving before the first pour. Our asphalt paving base preparation work shares the same base specification where owners compare the two.

Concrete versus asphalt over the life of the lot

First cost for concrete is higher in most cases. Life-cycle cost often favors concrete where loads are heavy, maintenance is hard to schedule or fluid exposure is likely. In cold regions, asphalt needs frequent crack sealing and periodic overlays, while concrete needs joint resealing and occasional panel repair. We can price both systems so the owner can compare.

The major cost drivers are thickness, base depth, reinforcing, dowels and joint sawing. Access and pour size matter too: a large open yard is cheaper per square yard than a small lot with islands and curb. For a truck terminal or cross-dock, we often recommend concrete in the maneuvering and dock approach areas and asphalt in lighter parking.

Who buys heavy pavement

Oilfield service companies and pipeline operators are major users of heavy yards. Oil, gas and midstream owners need pavement that handles heavy trucks, withstands spills and drains well, often on tight schedules. The Salt Creek Oil Field and the communities of Midwest and Edgerton to the north are part of this market, and the same pavement principles apply when we plan work for those yards.

Freight and logistics owners are the other main buyer, and logistics and warehouse developers near the airport and rail yard benefit from concrete's stiffness under heavy trucks. Dock approaches take the worst of it, which we cover under truck courts and dock aprons. We bid each yard based on traffic, drainage and the owner's maintenance plan, not on a standard thickness.

Tell us the trucks

Send the site plan, the traffic description and the geotechnical report. We will recommend thickness, joints and base, and price the pavement as you will use it.

Questions Owners Ask

How thick should heavy-duty concrete pavement be?

The design engineer sets it based on traffic and soil strength. Light-duty lots may use 5 or 6 inches, and truck yards often use 7 to 10 inches or more. We build to the design and check it against what the owner will really run on the pavement.

Do you use dowels and tie bars?

Yes, when the design calls for them. Dowels at transverse joints transfer load across the joint, and tie bars hold longitudinal joints together. We place them in baskets or by drilling, and we check alignment before the pour.

When can trucks use new concrete pavement?

After it reaches the specified strength, often seven days in warm weather and longer in cold. Cylinder or beam breaks confirm it. We recommend keeping heavy loads off until the test results are in.

Is concrete better than asphalt for a truck yard?

Often, yes, because it resists rutting and fluids. It costs more up front and needs joint maintenance. The right answer depends on loads, maintenance plans and budget, and we price both.

Ready to talk about your project?

Request a Project Review

Ready to talk about your project?

Send the plans to Concrete Contractors of Casper info@concretecontractorscasper.com

Back to Concrete Services

Call307-344-4067