Utility trenches in Bar Nunn follow street lines that were once runways, and anyone digging on this ground should expect it to remember the airfield. The town was built around Wardwell Field, Casper's original airport, which served the region until 1952, and the old runways now form its street pattern. We build streets, flatwork, pads and underground utilities for developers and builders here, and we start each job by finding out what the old field left in the ground before a design assumption turns into a change order.
Bar Nunn sits at 5,285 feet in the Casper metropolitan area and grew about 35 percent, from 2,213 residents in 2010 to 2,981 in the 2020 census. Growth like that arrives in phases, a block of lots here and a commercial pad there along US Highway 20-26, and each phase is a chance to do the ground right. We run the work as a chain: probe, strip, prove the subgrade, install utilities, form and pour, then prepare the base. Each link is tested and signed off before the next one starts.