Questions Owners Ask
How do you keep storm pipe from freezing or heaving?
Storm pipe carries water only during runoff, so it sits dry most of the winter, but the soil around it can still heave. We bed on stable material, compact the backfill in lifts, and avoid frozen soil in the trench. Structures are air-entrained concrete and sit on a compacted base below the frost line wherever the design calls for it.
What is the difference between detention and retention?
Detention holds stormwater temporarily and releases it at a controlled rate, so the downstream system is not overloaded. Retention holds water until it infiltrates or evaporates. Which one applies depends on the drainage design and the soil. We build either one to the grading plan and outlet structure shown.
Do you handle erosion control for the storm system?
Yes. Inlet protection, silt fence, outlet armoring and stabilized construction entrances are part of keeping the storm system clean while the site is under construction. We install them with the pipe, not after, and we repair them after storms.
What causes a new storm line to fail?
The usual causes are poor bedding, damaged pipe, open joints and silt from an unprotected site. Crushing by equipment in the first weeks is also common. We protect the pipe with cover before traffic crosses it, test where the specification asks and televise lines when the owner requires it.
Can the storm tie-in wait until the roadwork is done?
Usually not for long. Public corridors under reconstruction are closed to new cuts after paving, and a tie-in missed during the work can mean waiting a full season. We talk to the city and the road contractor early and put the tie-in on the schedule.