Platte River Commons

Building on a former refinery means the soil comes with a history, and Platte River Commons is the Casper site where that matters most. The refinery opened in 1895 and ran until its last barrel was refined in 1991. A citizen pollution lawsuit led to a remedy agreement in 2002, and the site is still recovering from contamination. Anyone developing a pad, a trail or a utility line there needs a contractor who treats dirt as a controlled material: where it came from, where it goes and what it is allowed to touch.

We approach Commons work in that order. First we learn what the owner's environmental documents say about caps, restricted zones and soil management. Then we plan grading, utilities and concrete so the plan is followed in the field, with stockpiles marked, haul routes set and clean fill kept separate. Finally we build the sidewalks, trail sections, pads and drainage the project needs. The result looks like ordinary site work, and under the surface it is not, which is why the plan comes first.

From refinery to river park and business center

A 1998 agreement between the City of Casper and Natrona County created a joint powers board to oversee redevelopment of the former refinery property, and the Commons has changed shape since. The former tank farm is now the Salt Creek Heights Business Center. The grounds also include a golf course, wildlife viewing areas and the Casper Whitewater Park, a half-mile stretch of the North Platte with four artificial rock structures. The Platte River Trail, about 10 miles of paved pathway from Paradise Valley Park to Bryan Stock Trail, follows the same river corridor.

That mix means three kinds of owners and three kinds of concrete: commercial lots that want pads and parking, public recreation that wants paths and plazas, and river-edge structures that have to survive moving water. Our commercial developer clients usually care about pad readiness and utility access, while public owners care about durability and accessibility.

What contaminated ground does to a permit

The remedy agreement and the site's history mean that excavation on the Commons often needs to follow an owner's soil management plan. That can include limits on cutting through caps, rules for sampling, handling excess spoil and importing clean fill. We do not interpret those documents on the owner's behalf; we follow them and flag conflicts between the plan and the construction drawings before work starts.

City commercial permits add their own layer. Casper often asks for a life-safety plan, engineered building and site plan drawings and Planning and Zoning approval, and an issued permit is good for 180 days. On a site with environmental conditions, the permit clock and the environmental review can collide. We help owners sequence submittals so neither side is waiting on the other, and we write the soil handling steps into the project schedule where they belong.

Clean fill, capped soil and controlled spoil

Where the plan calls for a cap, our job is to preserve it. Utility trenches that must cross a capped area are cut narrow, backfilled with clean imported material and restored to the original cap thickness. Spoil from restricted areas stays on lined or covered pads until it is tested and cleared for reuse or disposal. When fill is needed, we use engineered fill from documented sources, placed in compacted lifts with density tests recorded.

Stripping is its own step. Topsoil stripping and stockpiling on this ground is not about saving a nice lawn; it is about knowing what you removed and where you put it. Stockpiles are labeled, covered and kept away from drainage, and trucks leave through a cleaning station before they reach a public street.

Trails, plazas and river-edge concrete

The Commons includes public space, and public space means sidewalks and flatwork built for foot traffic, strollers and wheelchairs. We pour paths with the slopes, cross-slopes and joint spacing that accessibility rules ask for, finish them to a texture that holds up in frost and cure them to avoid scaling. For plazas and feature areas near the whitewater park, decorative and stamped concrete gives owners color and pattern without a separate paving material.

River-edge work has a different set of risks. Water scours the toes of structures, groundwater rises with the river and erosion controls have to work in real current, not just on a drawing. We plan sediment barriers, stabilized access and a flood contingency so equipment can be pulled out when the river rises.

Groundwater, frost and the river

The Platte sets the water table in this part of town, and a pad that looks dry in October can be wet in April. We check groundwater in test pits ahead of excavation, and where the table is high we plan groundwater dewatering with an approved discharge route. Pumped water cannot simply run into the river; where it goes depends on what it contains and what the owner's plan allows.

Frost adds the usual complications. Footings in Casper go three feet below grade to clear the frost line, according to the city's criteria, and trail concrete needs air entrainment to survive freezing and thawing with de-icers on adjoining pavement. Schedule-critical pours go in during the warm season, and shoulder-season work uses cold-weather protection. Our approach to nearby downtown Casper sites is similar when riverside plazas and streets are involved, and pad work near the refinery is covered in our notes on east Casper industrial ground.

Keeping crews and the public clear

Public access changes how a site is run. The trail and park areas have walkers, cyclists and anglers close to the work, so fences, signage and flagged detours go up before equipment arrives. Crews working on soil with a documented history wear the protective equipment the owner's plan calls for, wash before breaks and keep vehicles from carrying dirt off site. Dust is controlled with water at the source because it is the easiest way for ground to travel.

Every excavation has a competent person, a ladder within reach and a barrier that a child on a bike would notice. We hold a short meeting at the start of each shift and record who attended. None of this is extra; it is the normal cost of working next to the public.

Plan your Commons project

Send the parcel, any environmental documents and the schedule. We will return a soil handling plan, a sequence and a price. Call about your Commons project.

Questions Owners Ask

Can you dig on the former refinery site?

Yes, if the owner's environmental plan allows it and we follow it. We ask for the documents first, mark restricted areas, keep spoil separate and use clean imported fill where required. Conflicts between the drawings and the plan get raised before excavation.

How do you protect a cap or barrier during utility work?

By cutting narrow trenches, backfilling with clean material and restoring the cap to its original thickness. The owner's environmental consultant specifies the details, and we record what we did so closeout documents are complete.

What can go in the river corridor without special treatment?

Very little. Work near the water needs erosion control, stabilized access and a flood contingency plan, and some work needs agency approval. We ask what permits apply early and design the schedule around them.

Do trail slabs need special mixes?

Paths exposed to frost and de-icers need air-entrained concrete, proper joints and curing to resist scaling. Accessibility slopes are checked as we finish, because they are expensive to correct after the concrete hardens.

Is a building pad on the Commons different from one elsewhere in Casper?

It can be. Depending on the parcel, there may be requirements for vapor barriers, soil handling and testing that other sites do not have. We price those items separately so owners can compare.

Ready to talk about your project?

Request a Project Review

Ready to talk about your project?

Send the plans to Concrete Contractors of Casper info@concretecontractorscasper.com

Back to Service Areas

Call307-344-4067