Topsoil Stripping and Stockpiling

Six inches of topsoil on a high-plains site is worth more than the dirt under it, and it is also the first thing a careless crew buries. Topsoil holds the organic matter and the seed bank that a landscape needs, and in this climate it takes a long time to build. Stripping it first, keeping it clean and putting it back at the end is the cheapest landscaping decision on any project.

We remove topsoil from the footprint of building pads, roads and ponds, stockpile it in a protected place, and respread it on slopes, planting areas and swales. The job sounds simple, and it is. The mistakes are in the details: stripping too deep and mixing in subsoil, piling it where water runs, or letting it be driven over until it is compacted into a brick.

Topsoil is also a project asset that must be accounted for. A site that strips and loses its topsoil buys it back at import prices, and truckloads of good loam are not cheap at the elevation and distances this region deals with.

Stripping to the right depth and keeping it clean

We find the topsoil depth by probing and test pits, because it varies across a site. A scraper or dozer with a grade control strips to that depth and no more, and a second pass takes any additional organic layer the plan calls for. The topsoil is separated from subsoil and from any debris, and it is never mixed into fill.

Stockpiles are built with sides sloped to stay stable and tops graded to shed water. We locate them away from drainage paths and outside the work area, and we post a sign so no one parks or drives on them. Windblown loss and weeds are managed with temporary seeding or a cover crop on long-term piles. The plan also notes how long the pile will stand, since longer storage lowers quality.

From clearing limit to respread

The scope starts at the clearing limit. After erosion controls are in place, we strip, stockpile and keep a record of the volume. At the end of earthwork, we respread to the thickness on the landscape plan, usually four to six inches on lawn areas and more in planting beds. The subgrade is scarified first so the topsoil bonds to the layer below.

We also handle surplus. If the site produces more topsoil than it needs, we move it to a place that wants it, such as a berm, a neighbor's grading project or a municipal stockpile. The numbers are tracked by haul tickets, in coordination with import, export and haul-off. Fine finishing leaves a smooth, even surface for the seeding contractor, and fine grading techniques apply here as well.

Dry climate, wind and seed

Casper sits at 5,150 feet in a dry, windy region (the airport sits higher still, at 5,344 feet) where reestablishing vegetation depends on timing and moisture. Respread soil is loose and dries quickly. Wind carries seed and topsoil away if the surface is not tracked in or mulched. We schedule the respread to match the seeding window and, when possible, to occur before the dry months.

Stockpile weeds are another concern. Invasive species move into a pile and spread across the site when it is respread. A cover crop on the stockpile and a pre-respread inspection keep this in check. These points rarely appear on drawings, but a landscape architect will ask about them the first time a patch fails. A short written plan for stockpile care, signed by the owner before stripping begins, ends that argument before it starts, and it gives the seeding contractor a surface they can trust.

Campuses and public grounds

Casper College occupies more than 200 acres and 28 buildings on a hill between Casper Mountain and the North Platte River, and any expansion on a campus like that depends on preserved topsoil for lawns and plantings. Our work around an education or school site typically involves stripping before foundations, storing material in a safe corner, and respreading when landscaping begins. The Casper College area shows how much surface a campus has to restore after construction.

Parks, trails and riverfront areas ask for the same care. The Platte River Commons includes a golf course and wildlife viewing areas, a reminder that good topsoil is part of how public ground looks and performs.

Strip early, respread late

Topsoil comes off at the very start of earthwork, before any cut or fill touches the site. It goes back near the end, after utilities, paving and final grade are done. Between the two dates, the pile must be protected. That can be a long wait on a phased project, so we plan stockpile locations that will not be needed for later phases.

Respread is timed with erosion control and SWPPP final stabilization. A site is not stabilized until vegetation is established, so seeding must go on at the right time of year. Owners in schools and healthcare often want green grounds at opening, and a topsoil plan built backward from that date keeps the landscape on schedule.

Where topsoil work connects

Topsoil is handled together with site clearing and grubbing, cut and fill and pond excavation. A land developer working in a new subdivision will see it on the first day of mobilization and again at the last. Commercial developers often ask us to quote topsoil as its own item so the landscape contractor can see exactly what is available.

Send the landscape plan and the clearing limits

We will price the stripping depth, the stockpile location and the respread, and tell you how much topsoil the landscape architect is likely to need so the numbers are ready before the first cut.

Questions Owners Ask

How deep do you strip topsoil?

To the depth of the organic layer, usually four to eight inches in this region. We probe test locations because depth varies. Stripping deeper mixes in subsoil that is poor for plants, and stripping shallower leaves organic material under the fill.

Can topsoil be stockpiled through winter?

Yes. A well-shaped pile with a cover crop or mulch holds up through a winter. Snow and freezing do not harm it, but bare piles lose material to wind. We stabilize them before the season.

Do we need to test topsoil?

Many landscape specifications call for tests of pH, organic content and nutrients. We can sample the stockpile and send it to a lab. If it fails, the landscape architect may require amendments or imported topsoil.

What if the site has little or no topsoil?

Some sites, especially those with a long industrial history, have thin or disturbed surface soil. In that case, the landscape plan may require imported topsoil, and we price that as an import item. We confirm the quantity with the landscape architect before ordering.

Who owns the topsoil if we sell the property?

It is part of the site, and the contract decides who can remove it. We recommend stating in writing that stripped topsoil stays for the project's landscaping so it does not leave by accident.

Related

Ready to talk about your project?

Request a Project Review

Ready to talk about your project?

Send the plans to Concrete Contractors of Casper info@concretecontractorscasper.com

Back to Concrete Services

Call307-344-4067