Open ground around Casper looks empty from the road. It is not. Sagebrush with roots deeper than the blade of a dozer, thick grass sod, scattered cottonwoods along drainages, old fence lines, abandoned concrete, buried trash and the wreckage of whatever the parcel was used for before. Clearing is how we turn a raw parcel into a site that grading can start on.
Clearing removes what stands above the ground: brush, trees, fences, stockpiles, debris. Grubbing takes out what is below it: stumps, roots and buried organic matter that would rot and settle under fill. Both come before stripping topsoil and before any cut and fill. Skipping or hurrying either one leaves soft spots in the building pad, and soft spots show up as cracks in the slab a year later.
We clear to the limits drawn on the plans and no farther. The edge of the work is staked, fenced and honored, because the dirt outside that line belongs to someone else, or to the permit that protects it.
