Ground in Casper has a history, and a foundation crew reads it before digging. Part of the former refinery property along the North Platte is still recovering from contamination, and a Superfund site in Evansville involves groundwater contamination from past industrial operations. Most lots are clean. A few are not, and the difference shows up in the first test pit, not on the drawings.
We build concrete foundations for commercial and industrial buildings across Casper and Natrona County. That means excavation, footing and wall forms, reinforcing steel, placement, backfill and the inspections in between. Whether the load comes from a tilt panel wall, a steel frame or a masonry shell, the foundation has to carry it without settling and without heaving under frost.
We do not guess at soil. We want the geotechnical report before bid day, we want to know where the groundwater sits, and we want the structural engineer's footing schedule in hand. Then we price the work we can see, and list the risks we cannot.
