A drilled pier is a hole, a steel cage and a column of concrete. The hole does the work. If the auger finds cobbles, groundwater or caving sand, the plan changes before the cage goes in, and the crew needs to know what to do. We drill piers for tower foundations, building columns, equipment supports and sign and light structures where shallow footings will not reach competent soil.
Casper sits on the North Platte River at 5,150 feet, and the ground near the river and old industrial land is not uniform. A pier that bears on gravel in one hole can meet clay or bedrock in the next. We drill by the geotechnical report, log what comes out of each hole and call the engineer when the real ground does not match the boring log.
Spoils are part of the job. On some properties dirt leaves the site in a haul truck, and on others it stays in a controlled pile for testing. We plan for that before the rig shows up so the work does not stall waiting for a decision.