Drilled Pier Foundations

A drilled pier is a hole, a steel cage and a column of concrete. The hole does the work. If the auger finds cobbles, groundwater or caving sand, the plan changes before the cage goes in, and the crew needs to know what to do. We drill piers for tower foundations, building columns, equipment supports and sign and light structures where shallow footings will not reach competent soil.

Casper sits on the North Platte River at 5,150 feet, and the ground near the river and old industrial land is not uniform. A pier that bears on gravel in one hole can meet clay or bedrock in the next. We drill by the geotechnical report, log what comes out of each hole and call the engineer when the real ground does not match the boring log.

Spoils are part of the job. On some properties dirt leaves the site in a haul truck, and on others it stays in a controlled pile for testing. We plan for that before the rig shows up so the work does not stall waiting for a decision.

Why piers pencil out in this area

The airport is building a 157-foot air traffic control tower to replace a 50-foot tower from 1954, the kind of tall, slender structure that wants deep foundations and tight tolerances for overturning loads. Towers, tall racks, silos and crane pads all share the same need: a foundation that resists uplift and lateral load, not just bearing.

Piers also solve problems on poor surface soils, near utilities and on sites where excavation for a spread footing would undermine nearby pavement. They go through weak fill to the layer below. On the former refinery property known as Platte River Commons, where the site is still recovering from contamination, drilled work lets owners limit how much ground is moved.

How we drill, cage and pour

We locate every utility before the rig mobilizes, mark the pier centers from survey control and check the auger diameter and depth against the drawings. When we drill, we measure the depth as we go and clean the bottom. A dirty bottom is the most common reason a pier fails inspection, and it is the easiest one to prevent.

The rebar cage is built to the schedule, tied with spacers and lifted in without scraping the sidewalls. Concrete goes in with a tremie or a drop chute, so it does not segregate falling through water or striking the cage. We pour continuous, vibrate where specified and cut off the top to the right elevation once the concrete has set up.

Trucks pull up on mats if the ground is soft, and the rig works from a pad that is level and compacted. A drill rig that tips is a danger to everyone on site, so we check ground bearing under the tracks before we set up, especially after spring thaw when the top foot of ground turns to mud.

Frost, water and caving ground

Casper lists a three-foot frost line to the top of footing, so the top of the pier and any grade beam above it must be protected from frost heave. We isolate the upper section with sleeves or void forms when the engineer asks, and we avoid leaving the shaft open overnight in winter, since frozen cave-in at the top can contaminate the pour.

If the hole makes water, we pump out, set a casing or switch to a wet pour method. Caving sand needs casing or slurry, and we price those as options. We never let a crew work in an open hole. Any inspection happens from the surface with a light and a probe, or with a camera, and no one goes below grade without a written plan.

Inspections that cannot be skipped

Pier work is usually under special inspection, because once the concrete is in, nobody can see the hole. The inspector verifies diameter, depth, bearing material, cage placement and the concrete delivery tickets. We keep a drilling log for every pier and hand it over with the pour records.

Casper's commercial permit process requires engineered drawings and plan review of structural calculations and reports, and its engineering criteria list a seismic design category of B. We build to what the engineer sealed and make sure the geotechnical report and the drawings agree on pier length before the rig drills.

What moves the price of a pier

Depth, diameter, rock, water and access drive pier cost. A pier in a clean, dry hole costs a fraction of one that needs casing and a pump. Mobilization is a fixed number, so a tower with four piers costs more per pier than a building with forty. Tell us early if the ground is known to be difficult.

Spoils disposal and testing are the other big items. If the soil is clean, it can usually be spread or hauled. If the site has a history, we may need to stage the dirt and wait for results. The rock and hard ground excavation page explains how we handle drilling when the auger refuses.

Other work that connects to piers

Piers rarely stand alone. Most connect to grade beams that tie them together and carry the wall or slab loads between columns. They are placed with a rebar placement crew that sets the cages and checks cover. When the building has equipment inside, the same piers may sit under a machine foundation.

If your project is a pre-engineered metal shed, the pier layout is already set by the building manufacturer's reaction loads. We can review those with your contractor before bidding.

Pier work also shows up on pipeline and energy sites, where utilities and energy companies need foundations for poles, pipe racks and control houses on ground that cannot be trenched freely. In those cases the utility locate and the crossing agreement are often the longest lead items, so we start them first.

Tell us about the ground

Send the geotechnical report, the pier schedule and the site access. We will review the soil layers, flag any risk and give you a clear count of what we drill and pour.

Questions Owners Ask

Do you drill piers without a geotechnical report?

No. The report tells us the soil layers, groundwater and recommended bearing depth. Without it, the drilled depth is a guess. If your project lacks one, the engineer of record should order it before bidding so every contractor prices the same ground.

What if the auger hits rock or a boulder?

We stop, log the depth and call the engineer. Options include a rock auger, a core barrel or a change in the pier layout. These are priced as unit items so you know the cost before drilling starts.

How do you handle contaminated spoils?

We follow the site environmental plan. Spoils from a known contaminated property are staged, covered and tested before they leave. We do not mix them with clean soil, and we do not assume anything from appearance.

Can piers be poured in cold weather?

Yes, with the same protection rules as any structural concrete. The mix is warmed, the cage and auger holes are kept free of ice, and the top of the pier is blanketed after cutoff. Casper winters are long, so the schedule usually accounts for it.

Do you provide the rebar and the rig?

We coordinate both and sequence them so the cage arrives while the hole is open. Leaving a hole open overnight is a safety and quality risk, so we avoid drilling more than we can pour that day.

Ready to talk about your project?

Request a Project Review

Ready to talk about your project?

Send the plans to Concrete Contractors of Casper info@concretecontractorscasper.com

Back to Concrete Services

Call307-344-4067