A fault line runs along the north side of Casper Mountain, where an anticline pushes the rock layers up to 8,130 feet, about 3,000 feet above the city. The ground around Casper reflects that geology. Some sites dig like soil, and others hit rock a few feet down, cemented layers that a bucket cannot break or frozen ground that behaves like rock for months at a time.
Rock and hard ground excavation is the work of removing material that conventional digging cannot handle. We rip it with a dozer, break it with a hydraulic hammer or cut it with a trencher, depending on the hardness, the volume and what is nearby. Blasting is sometimes the right answer, and when it is, we coordinate with a licensed blaster.
The question at the center of most disputes is the definition of rock. A contract that does not say what counts as rock leaves the owner and the contractor arguing in the pit. We define it before the first bucket.