Casper Mountain

Steep ground changes every price. Casper Mountain rises to 8,130 feet, roughly 3,000 feet above Casper, and almost any concrete or dirt job on it means moving equipment up a grade, working on a slope and getting water off the site before it carries the site with it. We build pads, access roads, tower foundations, parking areas and utility trenches on that kind of ground, and we start every bid with the haul and the geology.

The mountain sits at the north end of the Laramie Mountains, with an anticline and a fault line on its north side. That is a geotechnical fact, not a trivia item. Bedrock close to the surface changes how deep we can dig, how we place drilled piers and whether a trench needs a breaker. Fractured rock near a fault can move water in ways a map does not show. We ask for the geotechnical report, read it and plan the excavation around what it says.

Wyoming Highway 251 climbs the mountain, and it is the only practical way up for a loaded truck. We plan the haul, the turnarounds and the weather around it.

Mountain design values and who sets them

Snow, wind and frost values are set locally across Wyoming and vary widely. One county lists a 32 pounds per square foot ground snow load and a 36 inch frost line in its design criteria, while another town requires 54 inch footings and a 40 pounds per square foot snow load. A mountain site above Casper does not match the city's published numbers, so the engineer of record has to confirm the criteria that govern before we form a footing.

We ask for the criteria in writing, along with the permit authority, the grading permit requirements and the erosion control plan. Steep sites often need a stormwater plan with specific controls for slopes and steep drainage. The trade team for erosion control and SWPPP installs silt fence, check dams, mats and sediment traps, and keeps the inspection log current. Without it, a spring storm turns a fresh cut into a mudslide.

Slopes, loads and winter on the grade

Machines on a slope tip, and trucks on a grade lose brakes. We use equipment rated for the grade, travel on a planned route and keep a spotter at every turn that needs one. Excavators work across a slope only when the operator can see and the ground is stable. Excavations are sloped or benched to the soil type, and we watch for movement after rain or snowmelt.

Winter is the main hazard. The road ices, daylight is short and snow load can bring down a temporary cover. We stage materials before the first heavy storm, carry chains and sand and shut down when the road is not safe. Concrete does not get placed in a storm. If the crew cannot climb the road, the pour waits. No schedule matters more than getting everyone back down.

Pads, piers and trenches on rock and slope

Tower and transmitter sites are a natural fit for mountain concrete. Many of Casper's TV and FM transmitters sit on towers at Tower Hill on the mountain, and those towers need foundations, equipment pads and conduit. We build drilled pier foundations, spread footings, equipment slabs and cable trenches, set anchor bolts to template and cure the concrete in a way that suits the cold.

Recreation sites are another. The Hogadon Ski Area and the trail network call for parking, walks, building pads and utility lines, usually in short seasons and tight spaces. We rough-grade, stabilize the cut, place the base and pour the slab, then restore the slope so it does not wash out. For hard ground, the trade partners for rock and hard-ground excavation and drilled pier foundations share the same plan.

Hauling concrete and fill up a grade

Ready-mix does not like a long climb. Every mile adds heat, vibration and time, and a drum that stops on the grade can set up. We work with the batch plant to confirm the haul time, adjust the mix with retarder if needed and use smaller loads to keep each truck within its working window. A pump positioned at the pad makes the final delivery easier, and a spare truck waits at the base when the pour is critical.

Fill and aggregate follow the same logic. Import is expensive on the mountain, so we reuse cut material where the engineer allows and compact it in lifts. Spoil that cannot stay goes off the mountain by an approved route. We map the whole earthwork balance before pricing, since it often matters more than the concrete quantity.

Why a mountain job is priced differently

Four things raise the price: access, rock, weather and scale. Access adds travel time and limits truck size. Rock slows excavation and wears tools. Weather shortens the season. A small pad has the same fixed costs as a large one, so the unit price is higher.

We reduce the cost where we can. We group scopes into a single mobilization, order materials to match the pour, reuse cut material and plan the work for the dry season. A clear scope and an early geotechnical report help most, because they remove the guessing from the number. We price each of those items separately so you can see where the money goes.

Reaching the mountain from town

The mountain is about 6 miles south of downtown Casper. The construction trade partners work from the city and travel up Wyoming Highway 251, and we take work on the lower slopes as well as the summit area. The hill campus at Casper College has similar slope and drainage challenges at a lower elevation, and we apply the same erosion and grading methods there.

Farther out, the dam site at Alcova shares the remote-site challenges of long drives and fast weather. For owners that run transmitters, towers and power lines, our utilities and energy companies work is built around foundations and trenches that last through winter.

Walk the grade with us before you set a budget

Send us the location, the drawings and the geotechnical report. We will drive the route, check the ground and return a scope, a schedule and a price.

Questions Owners Ask

Do you need special equipment to work on the mountain?

We use equipment rated for the grade, with proper tires or tracks, brakes and winches as needed. Trucks travel on a planned route, and some loads are broken into smaller deliveries. We also schedule around the weather.

How do you control erosion on a steep cut?

We install silt fence, check dams, mats and sediment traps, stabilize the slope as soon as grading ends and keep the inspection log current. We schedule the earthwork so slopes are not left bare through a storm.

What does the fault on the north side mean for a project?

It means the geotechnical report matters. Bedrock and fractured zones change excavation, pier depth and drainage. The engineer uses the report to set the design, and we build to it. If we find something different, we stop and ask the engineer.

Can you pour concrete up there in winter?

Only with a plan. We need thawed subgrade, cold-weather protection and a road that is safe for the trucks. If any of those are missing, we wait. Spring to fall is the best window.

Who sets the snow load and frost depth?

The local authority and the engineer of record. Wyoming does not use a single statewide figure, and mountain sites can differ from town values. We ask for the criteria in writing before we form footings.

Ready to talk about your project?

Request a Project Review

Ready to talk about your project?

Send the plans to Concrete Contractors of Casper info@concretecontractorscasper.com

Back to Service Areas

Call307-344-4067