Equipment Pads and Machine Foundations

Thirty thousand barrels a day goes through the refinery on the east side of Casper, and every pump, compressor and heat exchanger in that flow sits on concrete somebody had to get right. A machine does not forgive a foundation that rocks, settles or resonates. If a pump base is out of level by a sixteenth of an inch, the seal wears out in half the time and the maintenance team knows exactly who to call.

We build equipment pads, skid foundations, pump bases, compressor blocks and generator pads for plants, oilfield yards and utilities in the Casper area. Some are a simple 8-inch pad for a small skid. Others are heavy blocks with embedded bolt cages, grout pockets and isolation joints. We build each to the equipment vendor's drawing and the engineer's stamp.

The work looks small until you list what has to be right: size, elevation, bolt location, steel, concrete strength, cure time and the date the equipment arrives. We keep all of them on one page.

Who needs these foundations

The refinery district in east Casper and the oilfield yards to the north have the highest density of rotating equipment in the metro. Oil, gas and midstream operators and industrial and manufacturing owners hire us for skids, tank pads, pumps and compressor stations that need a slab ready before the vendor ships.

Municipal water plants and utility yards need the same thing at smaller scale. A booster pump, a generator or a transformer sits on a pad that has to hold level through freeze and thaw. We also set pads for rooftop and ground-mounted mechanical equipment at commercial sites where the building contractor does not carry the concrete scope.

In the east Casper refinery area, a pad often has to coexist with pipe racks, underground lines and a tight turnaround window. The owner decides when the unit is down, and the foundation has to be ready before that date. We plan backward from the outage, count the days for forming, steel, concrete cure and grout, and tell the owner early if the numbers do not fit.

From dig to grout

The scope starts with the vendor's foundation drawing: loads, anchor bolt pattern, grout thickness and any isolation requirements. We excavate to the required depth, compact the base, place formwork and set the anchor bolts with a rigid template that holds them plumb and on spacing through the pour. A template made of scrap wood moves, and bolts that move cost money to fix.

Concrete goes in as a single placement for most pads, vibrated well around the bolts. After curing, we chip the surface for grout, set the equipment on shims, and place non-shrink grout when the vendor specifies it. Some pads are sized for future equipment, so we leave extra embeds and conduit sleeves in place. If the machine vibrates, the engineer may call for a mass block, springs or a separate isolation joint from the floor slab, and we form those details carefully.

Getting the details right

Anchor bolts are where most mistakes happen. We shop the bolt layout against the equipment drawing, check projection and thread length, and sleeve the bolts when the vendor wants adjustment room. Before the pour, we survey the template and sign it off with the owner's representative. After the pour, we survey the pad top and the bolts again and give you the numbers.

The top surface is finished to the flatness the grout needs, and the edges are chamfered so they do not chip. In winter we pour with heated materials and blankets, because a pad that freezes in the first day can lose strength it will never get back. See our guide to cold-weather concrete for the protection plan we use.

Working inside an operating plant

Plants have their own rules, and we follow them. That means site orientation, hot-work and excavation permits, lockout boundaries and gas monitoring where required. We keep concrete trucks and pumps on approved routes and out of process areas. A stray hose line across a pipe rack is not acceptable anywhere, and we treat it the same way in a plant.

Excavation near live process lines gets potholing before digging, and we hand-dig around anything the owner marks as energized or pressurized. Crews are briefed daily on the day's tasks, the nearest muster point and who to call if something does not look right. Nobody hurries through a pad pour inside a refinery fence.

Pads that sit under tanks or around loading points often tie into spill control. We coordinate with the crew building containment pads so the curb, the slope and the pump base all agree. If a pump needs a continuous supply of concrete in a tight yard, we match the placement method to the space, using a small boom or line pump as described in our pumping and placement notes.

What drives cost

Size and steel set the baseline. After that, access and downtime matter most. A pad in an open yard with a clear truck route is simple. A pad squeezed between pipe racks needs a small pump, hand placement and extra labor. Permit and lockout time add to the daily rate, and we show those items separately.

Foundation specifications often include a rebar cage that takes real time to detail and tie, plus grout and bolt hardware supplied by the vendor. If the equipment is not on site when the pad cures, we hold the grout step until the machine is set and aligned. Early notice of the equipment delivery date lets us avoid paying for crews that wait.

Send the vendor drawing

Send us the equipment foundation drawing, the delivery date and the plant access rules. We will return a pour plan, the template details and the work permit steps we need.

Questions Owners Ask

Do you pour pads for equipment that has not arrived yet?

Yes, but only when the vendor drawing is final. We pour to the certified drawing, not an estimate. If the equipment model changes, anchor bolts may move, and a pad poured to an old drawing becomes scrap.

How long before equipment can be set on a new pad?

Typically after the concrete reaches the specified strength, which is verified by cylinders. Many vendors also want a minimum cure time for the grout. Cold weather stretches both, and the schedule should say so before the pour.

What is a vibration isolation joint?

It is a gap, usually filled with a flexible material, that separates a machine foundation from the surrounding floor slab. It keeps equipment vibration from traveling through the slab and cracking it. The engineer shows it on the drawings, and we form it as shown.

Can you work inside a live refinery or yard?

We can, with the owner's site rules in place. That includes permits, escorts, gas monitoring and approved traffic routes. We plan the work around operations and give the owner a daily schedule they can plan against.

Who is responsible for grout?

The vendor or the engineer specifies the grout and the thickness, and we place it. If the equipment manufacturer needs to witness the placement, we coordinate the visit so grouting happens on the day the machine is aligned.

Ready to talk about your project?

Request a Project Review

Ready to talk about your project?

Send the plans to Concrete Contractors of Casper info@concretecontractorscasper.com

Back to Concrete Services

Call307-344-4067