Ice decides where a sidewalk fails. Water finds the low spot, freezes under the surface, and spalls it. Or it pools at a joint, freezes, lifts the panel and leaves a trip edge by spring. Almost every sidewalk problem we are asked to fix in this region comes back to drainage, air content or joint layout, and almost none of them come back to a lack of concrete.
We pour sidewalks, plazas, building aprons, pedestrian ramps, curb returns and the other flatwork that surrounds a commercial building in the Casper area. The work looks simple, and it is the part of a project the public touches every day. A trip hazard here becomes a claim, and a slab that drains toward the door becomes a daily complaint.
The job is largely about grade. Slopes have to meet accessibility rules, drain away from buildings and still tie into existing walks, curbs and doors at the right elevation. We survey those elevations before forming, and we ask the architect or engineer about any point where the drawings do not close.