When a street gets rebuilt, the concrete at the edge is the last thing people notice and the first thing that fails if the utilities beneath it settle. The state's reconstruction of Poplar Street between Collins Street and the North Platte bridge, awarded at $12.79 million, bundled a new road surface with storm and sanitary sewer and utility upgrades. A follow-on project of about $12.8 million, from CY Avenue to Collins Drive, runs to a contract completion in 2028 with detours via Ash Street. Curb and gutter sits at the center of work like.
We form and pour curb, gutter, valley gutters, curb returns and inlet aprons for streets, parking lots and commercial sites around Casper. The job is a precision one. A curb line that wanders by an inch is visible from the road, and a gutter that holds water an inch too deep stays wet and freezes.
The concrete is a small part of the drawing and a large part of how the site drains. We read the grading plan first and the curb detail second, and we mark every inlet and low point before the machine or the forms arrive.
