Detours via Ash Street are part of the plan for a two-year, $12.8 million reconstruction of Poplar Street (WYO 220) between CY Avenue and Collins Drive, with a contract completion date of September 30, 2028. The detour exists because the road has to be dug up, rebuilt and repaved, and the subgrade under it is the first thing that has to be right. Pavement is a thin skin over a platform of soil, and the platform does most of the work.
Road subgrade preparation is the sequence of work that brings the native soil to a uniform, stable, compacted condition at the elevation the pavement section requires. We excavate to subgrade, remove soft or organic material, scarify and recompact the top layer, stabilize where the engineer calls for it and proof-roll the result.
The work goes on in public view. Traffic keeps moving next to it, residents ask questions and the schedule is tied to a completion date. We plan for those pressures from the start.