Demolition and Site Prep

The tank farm that once stood on the former refinery property at Platte River Commons is now the Salt Creek Heights Business Center. Casper has a long record of turning industrial ground into something else, and the first step each time is taking down what was there. Demolition and site prep clear the way: we remove structures, slabs, foundations, pavement and utilities, and leave a site that earthwork crews can work without surprises.

The job is more than knocking things down. It starts with surveys and disconnects, continues through careful sorting of materials, and ends with a clean, graded, documented site. The people who hire us want to know three things: what was there, where it went and what is left in the ground.

We demolish and clear commercial buildings, yard structures, old pavements and equipment foundations on redevelopment sites. We bring the equipment, the safety plan and the discipline to do it without damage to neighbors and without surprises for the owner.

Redevelopment ground in the Casper area

The refinery at Platte River Commons opened in 1895 and ran until the last barrel was refined in 1991. A 1998 agreement created the joint powers board that oversees redevelopment, and the refinery's former owner pledged more than $28 million toward replacing the jobs lost when the plant closed. Demolition on a site like that happens in layers, over many years, and each layer has its own rules.

Smaller examples occur across the county. At Hell's Half Acre, a roadside restaurant and motel closed in 2005 and were later demolished. A building that sits at the edge of a ravine, far from services, has its own logistics, including long hauls and limited access. We handle both the big redevelopment and the small teardown with the same step-by-step discipline.

What may be hiding in an old site

Old buildings carry asbestos, lead paint and other regulated materials. Industrial sites may have underground tanks, buried piping, stained soils and old foundations that no drawing shows. Before a machine touches an old structure, the owner should have a survey for regulated materials and a plan for their removal by licensed specialists.

The ground is part of the job. Slabs and footings extend below grade and can go deeper than they look. Septic fields, drywells, cisterns and fuel tanks turn up when the site is stripped. We keep a log of every discovery, stop work when the unexpected appears and call the owner and engineer. Some finds can be handled in minutes. Others, especially on former industrial ground, need a plan.

Taking buildings down without hurting anyone

Demolition is dangerous work, and the plan is the first safety tool. A written demolition plan covers the sequence, the exclusion zones, the equipment and the protection of adjacent structures and utilities. Utilities are disconnected, tested and tagged before we start. Gas, power, water, sewer and communications are verified dead by the utility or a qualified person.

Dust, noise and falling debris affect neighbors, so we wet the work, control the hours and fence the perimeter. Workers wear respiratory protection when needed. Cutting and torch work is permitted and watched. Structures are brought down in a planned order, with no one inside or underneath. If something does not look right, such as a hidden beam or a bulging wall, we stop and reassess.

Sequence from disconnect to clean pad

The work moves in order. First come surveys and permits, then utility disconnects and cap-offs. Interior strip-out follows, with regulated materials handled by specialists. Then structural demolition: we bring down the building in a controlled sequence, and cut and remove the slab. Foundations and footings are removed to the depth required by the new design, or left in place if the engineer approves.

Concrete and masonry go to a crusher or a recycling yard, steel goes to scrap and general debris goes to a landfill. The site is then cleared and graded, and any voids from tanks or foundations are filled with compacted material. Where heavy slabs must be broken, see our notes on concrete demolition and removal. Brush and trees on the site are removed with site clearing and grubbing before earthwork begins.

Permits and paperwork

Demolition needs a permit from the city, and the permit may require utility disconnect letters and notifications. Casper commercial permits often require engineered drawings and approvals, and any structure being replaced is usually part of the same submission. Regulated material surveys and notifications may be required before the work can start.

The documentation matters afterward. We keep disposal receipts, recycling tickets and load records so the owner can show where the material went. If a lender or buyer asks for proof that a site has been cleared properly, the file is ready. When soil from an old industrial site has to move, the plan in import, export and haul-off applies.

From demolition to dirt work

Demolition is a gate in the schedule: nothing else on the site can start until it is done. Weather affects it less than most work, but permits, utility disconnects and regulated material removal can all delay the start. We ask the owner to start those items early, and we sequence the work so earthwork can begin on cleared areas while the rest is coming down.

On an operating facility, demolition must happen around production. Plant owners in industrial and manufacturing settings often have shutdown windows, hot-work rules and restricted areas. We plan to the shutdown calendar, and we say honestly what can be done in a window and what cannot. A pad prepared for a new manufacturing plant or addition will follow this clearing.

Send the building list and the site survey

We will price demolition, haul and site clearing as separate items, list the surveys and permits that have to be in hand first and give you a date when the ground is ready for earthwork.

Questions Owners Ask

Do you remove asbestos and other regulated materials?

Those materials are removed by licensed abatement contractors, not by a demolition crew. We coordinate the work and begin demolition only when the survey and clearance are in hand. Mixing the two trades creates liability for the owner.

Can foundations stay in the ground?

Sometimes. If the engineer approves and the new structure does not conflict, old footings can be abandoned in place. Otherwise, they are broken out and removed. We find out which is required before we price.

How do you handle underground tanks found during demolition?

We stop, secure the area and notify the owner. Tank removal and any soil cleanup follow regulated procedures by qualified specialists. We then backfill the void with compacted material after clearance.

What happens to the concrete and steel?

Concrete is crushed and reused as base where allowed, steel is recycled and clean debris is hauled to an approved facility. We track the loads and provide receipts. Recycling lowers disposal cost and helps meet owner goals.

How long does demolition take?

A small building may take a few days. A large industrial site can take months, mostly because of utilities, regulated materials and sorting. Our schedule lists those steps separately.

Ready to talk about your project?

Request a Project Review

Ready to talk about your project?

Send the plans to Concrete Contractors of Casper info@concretecontractorscasper.com

Back to Concrete Services

Call307-344-4067