Public owners buy concrete by the bid sheet, and the bid sheet has no room for guesses. Quantities are fixed, alternates are priced separately and the low number wins unless the paperwork is wrong. Our job is to read the documents closely, find the pour windows and the haul routes that the drawings do not show and put a number on them that we can build.
Government and municipal buildings in the Casper area cover a wide range: a fire station, a public works shop, a town hall, a water treatment structure, a school or college building, an airport facility or a recreation building. They share three traits. They carry public money, they answer to elected boards and they are expected to last. That drives thick slabs, durable mixes and careful records.
The ground work matters as much as the building. Most civic sites need water, sewer, storm and fiber before a wall goes up.
