A 157-foot control tower replacing a 50-foot one is the kind of job that shows what airport concrete demands. The airport announced a tower of just under $30 million to replace the one built in 1954, with completion expected in early 2028. Nothing about a project like that is casual: a tall structure on a small footprint needs a foundation designed for overturning and wind, a base built to tight tolerances and a pour sequence that does not leave a cold joint in a critical element. We bring that discipline to the airside and landside work around the field, from aprons and hangar floors to utility lines and fiber conduit.
Casper-Natrona County International Airport covers 5,150 acres at 5,344 feet, with a 10,165-foot runway and an 8,679-foot crosswind runway, each 150 feet wide. In 2022 it logged 43,126 operations, 71 percent of them general aviation, which tells you how much of the demand is hangars, small-aircraft aprons and tie-downs. The business park next door and the foreign trade zone designation add warehouse, shop and logistics buildings to the mix. Whatever the scope, the schedule bends around flight operations, and we plan with that in mind from the first meeting.
