A hangar slab carries a wing-tank-full aircraft on three small tires, a tug and a mechanic with a creeper, and it has to drain, resist fuel and hold a door track within a quarter inch of level. The building is a simple box. The floor, the door and the apron are where the engineering lives. We build the concrete and the site work for hangars at Casper-Natrona County International Airport and for private airstrips across the county.
The airport has two asphalt runways, 3/21 at 10,165 by 150 feet and 8,679 by 150 feet on 8/26, at 5,344 feet of elevation, and it logged 43,126 operations in 2022 with 131 based aircraft. Seventy-one percent of those operations were general aviation, which is the traffic that fills hangars. The airport is also putting up a new 157-foot control tower to replace a 50-foot tower built in 1954. That work tells you the field is investing, and hangar owners will want to build while the ramps are open.
The sections below explain how we handle floors, door foundations, aprons and the unusual rules that come with work beside active runways.
