Water that stays on a slab in a Casper winter turns into ice, and ice on a dock apron or shop floor hurts people and equipment. Trench drains and concrete drainage features move water off the surface before it freezes. Done right, they disappear into the floor. Done wrong, they hold water in the low spot and push it toward the door.
We install trench drains, channel drains, concrete swales, valley gutters, curb inlets, sloped aprons and drainage aprons around buildings and yards. The work covers excavation, bedding, drain bodies, rebar, forming, concrete placement, grate setting and connection to the storm line or sump.
The details are small and strict. A slope off by a quarter inch over ten feet decides whether a drain works. We set grades with a laser, check them before the pour and check them again after.
