A slab that has dropped half an inch at a joint is a trip hazard, a forklift problem and a drainage problem. Replacing it means demolition, new subgrade and weeks of curing. Lifting it back to grade can take an afternoon, and the cost is a fraction of a new pour. The catch is that lifting only works when the slab is sound and the cause of the settlement is understood.
We level and lift slabs that have settled over voids, soft fill, leaking utilities or washed-out base. The work covers loading dock aprons, warehouse floors, sidewalks, trail sections, parking lot panels and equipment pads. Methods include drilled injection of cementitious slurry or expanding foam, and grinding or planing for minor lips.
Before we drill a single hole, we find out why the slab moved. If water is still running under it, lifting is a temporary fix. We recommend repairing the source, then raising the concrete.
