Casper's engineering criteria list severe weathering and an air freezing index of 3,000. In plain terms, concrete here freezes, thaws and freezes again, and it does so while salt, sand and dust grind on it. Surfaces scale, edges spall and joints open. Repair work in this market is not cosmetic. It is the only way to keep a sound slab from becoming a replacement project.
We repair slabs, stairs, curbs, loading docks, plaza surfaces and structural elements. The work includes crack injection, spall patching, joint resealing, partial-depth and full-depth removal, overlays and surface restoration. Every job starts with finding why the concrete failed, because a patch placed over an active cause fails again within a season.
We tell owners what we see even when the answer is bigger than the patch they asked about. A repair that hides a drainage or subgrade problem costs more in the long run.
