Salt and freeze-thaw decide how long a parking deck lasts. Every winter, cars carry meltwater and deicer onto the deck, the water finds the smallest crack, and the next freeze pries it wider. After enough cycles the chloride reaches the steel, the steel rusts and the concrete spalls. A deck that was fine at ribbon cutting can be a repair project in a dozen winters if the mix, cover and drainage were wrong.
Casper's criteria describe the problem plainly: a 3,000 air freezing index and severe weathering. A Natrona County climate record shows a low of minus 42 F and a high of 106 F, a range wide enough to open every joint in a structure. We build decks here with that range in mind, from the mix design to the sealer.
Parking structures are the one building type that is nearly all concrete, so the decisions we make on the slab are the decisions that decide durability.