A slab that hangs in the air weighs the same as one on the ground, and every pound of it rides on shoring, forms and a pump line until the concrete gains strength. A four-inch topping on a metal deck over a 10,000 square foot floor is roughly 125 cubic yards, and it has to arrive, lift and finish before the batch stiffens. That is why we plan elevated pours backward from the pump, not forward from the drawings.
We place structural slabs, composite metal deck toppings, stair and landing pours and parking deck levels around Casper and Natrona County. Most of the work is supported on steel or on cast-in-place columns, and the slab thickness, the shoring plan and the strength you need before stripping all come from the engineer of record. Our job is to build exactly that and prove it.
Elevated work is less forgiving than flatwork. A missed shore, a rebar mat that sits on the deck instead of in the slab, or a pour that gets rained on in the middle of the placement can mean coring and repairs two floors up. We keep the sequence short, the crew small enough to coordinate and the safety rules posted at the access point.
