Data Center Duct Banks, Pads and Site Work

Conduit is the cheapest part of a data center and the most expensive to get wrong. A duct bank that is out of slope, short of cover or poured around the wrong sleeve cannot be fixed after the building is energized without taking something offline. For a data center in the Casper area, the concrete and dirt work is mostly about getting power and fiber to the building and keeping heavy equipment on pads that do not move.

Fiber is already being built in this part of the state. The Wyoming Business Council approved $617,483 in grant funding for Natrona County to install about 30,000 linear feet of fiber optic cable in and around the airport business park at 8500 Airport Parkway. The Town of Mills has signed franchise agreements with several telecom providers to build and operate fiber networks. Those are the corridors where a data center operator will ask for new duct bank and handholes.

We do the trenching, the encased duct, the equipment pads and the building slab. This page explains how we approach each of them, and what a data center owner should sort out before the first trench is opened.

Fiber, power and ground near the airport

The airport side of town has several things a server building looks for: fiber being installed around the business park, a Foreign Trade Zone magnet site of 492 acres at 8500 Airport Parkway and room to build. The airport business park is also next to the runways, which brings height and lighting rules that a designer must check before locating a building or a cooling yard.

On the power side, the region has a coal-fired generating station at Glenrock on the Interstate corridor, and the utilities that serve it will decide how a new load is brought in. We do not design the service; we build the trench, the encasement and the vault that the utility specifies. A data center owner will need an early meeting with the serving utility to learn what capacity, voltage and routing are available. We can join that meeting with a constructability view.

Duct banks, vaults and fiber paths

Our electrical duct banks are trenched to line and grade, bedded, spaced with chairs, reinforced where the drawings require and encased in concrete, often with red dye on the cap so a later excavator knows what is below. Manholes and pull boxes are set on compacted base with their lids at final grade. We pull a mandrel through each run to prove it is clear before we backfill.

For telecom paths, conduit and fiber trenching uses narrower trenches, sweeps with the bend radius the carrier specifies and handholes placed at the spacing required. Where two carriers cross the same corridor, we coordinate depth and separation so each has room. Trench backfill is compacted in lifts, because a settled trench becomes a ditch across a paved yard.

Pads, slabs and the site around them

A data center site has more heavy equipment than most buildings: generators, transformers, switchgear, chillers and fuel tanks. Each sits on a pad with a specific size, embed plate pattern and tolerance. We form and pour equipment pads and machine foundations with the manufacturer's anchor bolt template in place, and we survey them before accepting the pour.

The building slab is typically heavily loaded and flat enough for raised-floor pedestals or racks. We pour it in planned sections with a mix and cure schedule to limit cracking. Around the building, the pavement carries delivery trucks and crane outriggers during equipment setting, so we design the base for that load. A data hall built as a tilt-up building has its panels cast on that same slab, and an office building with a server room needs a smaller version of the same pads and duct paths.

Conflicts, cover and cleanliness

Every trench in an unfamiliar parcel starts with utility potholing and locating. Gas, water, power and telecom lines rarely follow the plan, and a data center depends on a clean outage-free build. We expose crossing utilities by vacuum excavation, record elevations and adjust our alignment before heavy equipment gets near.

Dust and water are also concerns. Finished concrete slabs are swept and sealed to keep the rooms clean, and site grading is finished so stormwater runs away from the equipment yard. Casper lists a seismic design category B and severe weathering, which feed the design of the pads and the concrete mix that we use outdoors.

Long-lead items set the calendar

The critical path on a data center is rarely concrete. Switchgear, generators and chillers have long lead times, and the building must be ready to receive them when they arrive. We schedule pads and duct banks so they are cured and inspected before delivery, and we tell the owner when each pad has to be poured to avoid a stored-equipment penalty.

City permits last 180 days after issue and plan review looks at structural calculations, so the owner should file the foundation and site packages early. We pair that with winter planning: a duct bank concrete pour in a January trench needs heated cover, and we would rather pour in October.

Energized work and deep trenches

Trenches deeper than five feet need protective systems, and data center duct banks are often deeper. We use shoring or sloping designed for the soil, keep spoil back from the edge and provide ladders at intervals. We plan lifting with a clear route for the crane, since transformers and generators are heavy and awkward.

Work near energized lines needs clearances. We confirm overhead and buried power positions before mobilizing, and we maintain the required distances for equipment such as pumps and excavators. The construction trade partners complete the site orientation that the owner and the utility require before they enter. Municipal owners and utilities and energy companies often add their own rules, and we follow the strictest one on the job.

Send the site plan and the one-line

Send the parcel, the site plan and the electrical one-line if you have it. We will price the duct bank, pad and building slab work separately and flag every utility conflict we find.

Questions Owners Ask

Do you install the conduit and the concrete encasement together?

Yes. We place the conduit, spacers and rebar, inspect them with the owner's representative, and then pour the encasement. For long runs we pour in sections and keep the spacers tied so the conduit does not float. We check the line afterward with a mandrel to prove it is clear.

How deep should a duct bank be in Casper?

The design sets it, and the frost line matters. The city lists a three foot frost line to top of footing, and utilities set their own cover requirements. We bury to the drawing and the utility standard, whichever is deeper, and we call for locates before digging.

Can a data center be served by new fiber near the airport?

Fiber is being installed in and around the airport business park, and the Town of Mills has telecom franchise agreements for fiber networks. Whether a given parcel can connect depends on the carrier. We can build the handholes and conduit paths once the carrier gives us its requirements.

What tolerances do equipment pads need?

Tight ones. Generator and switchgear pads must be level, square to the grid and dimensionally exact where bolts and plates go. We survey forms before the pour and the finished pad after, and we report the results to the engineer.

Related

Ready to talk about your project?

Request a Project Review

Ready to talk about your project?

Send the plans to Concrete Contractors of Casper info@concretecontractorscasper.com

Back to Building Types

Call307-344-4067