A bollard exists to stop a vehicle. A 6-inch steel pipe stuck in a hole with a handful of concrete will not do that. The strength is in the foundation: depth, diameter, reinforcing and the way the post is tied into the footing. We build bollard foundations that match the design intent, whether the goal is protecting a gas meter or keeping a truck off a storefront.
Beyond bollards, we pour the small concrete that sits around every site: light pole bases, sign foundations, dumpster enclosures and pads, transformer pads, fuel island slabs, mailbox and cart corrals, flag pole footings and curbs. Each piece is simple, and each has to be in the right place at the right time.
General contractors schedule these items as a punch list. They matter more than that. They are the first thing a customer or inspector touches.
